The Hera-Nymagee underground gold and copper mine is located in central New South Wales, 100 kilometres south east of Cobar. The Hera gold deposit and the Nymagee copper deposit are being developed by Aurelia Metals Limited.
The Hera deposit is being developed using the longhole open stoping method and cemented rock fill. Sill pillars are placed to divide the mine into stoping areas. The three stage crushing circuit processing plant is able to grind up to 250 micron and the gravity gold circuit is capable of extracting eight percent silver and 60 percent gold. Processing of the gold and silver components is applied using the Merrill Crowe method (the removing of gold by means of a cyanide solution). Base metal extraction will be achieved using bulk sulphide flotation technology.
Surface earthwork undertaken at the Hera project was completed by Neill'sEarthmoving of Nyngan in New South Wales. The ore processing plant was constructed under an Engineering, Procurement and Construction (EPC) contract with Gekko Systems of Ballarat in Victoria. Gekko were assisted by AMI with the mine's project plant design and flow sheet development. Pybar Mining Services of Orange in NSW were awarded the mining contract and underground mine development. At peak production Pybus will be expected to mine 350,000 tonnes of ore a year. Pybar were awarded a seven year contract to carry out drilling, blasting, shotcreting, cable bolting, haulage and production work generally. The accommodation village was constructed by Ausco Modular. The Mining Study and the Definitive Feasibility Study was undertaken by Optiro Mining Consultants and the Hera-Nymagee geotechnical study was completed by Coffey Mining.