About:

Iluka Resources commenced mineral sands production at the Woornack, Rowneck, Pirro (WRP) mining operation in early 2012, a full twenty days ahead of schedule after equipment from the mined out Kulwin operation arrived at the new mine site near Ouyen in north west Victoria's Murray Basin.


WRP Mineral Sands Mining Project is an Important Source of Rutile

The new mining operation is expected to have a mine life of three and a half years that may be extended if further reserves are proven feasible. The WRP sand mining operation is an important source of rutile for Iluka that is the world's largest producer of the mineral. Rutile is a titanium dioxide product that is highly sought after and as such escaped much of the downturn of demand caused to other minerals because of the Eurozone debt crisis of recent years. The mine is currently operating at 100 percent production capacity.


WRP Owner Iluka is the World's Leading Producer of Rutile

Iluka Resources has mineral sands operations, project development and exploration interests in Australia and the United States, it is the world leader in the production of synthetic rutile as well high grade titanium dioxide products.


Mining Operation at WRP Contracted out to Watpac
Iluka operate the processing plant at the Woornack, Rowneck, Pirro (WRP) project but have contracted out the mining operation to Watpac. Watpac is currently mining two pits at the WRP Ouyen mine site with the use of conventional trucks, tractor scoops, scrapers and excavators. The mobile plant is currently mining the topsoil, subsoil, overburden and orebody at the WRP mine site at the rate of one million bank cubic metre (BCM) a month.


WRP Mine is 25 Kilometres From Ouyen
The WRP sand mining operation consists of three parallel mineral deposits; Woornack, Rowneck and Pirro located about 25 kilometres from the Ouyen township. The project is one of many mineral sands deposits Iluka has, or plans, to mine in the future, in the Murray Basin Region. The Kulwin deposit was the first of the northern Murray Basin deposits to be mined by the company. It was depleted in early 2012 when Iluka transferred its infrastructure to the new WRP mine site.


Production Began at the WRP Mine in 2012
The first heavy mineral concentrate was produced at the WRP mine in May 2012. The mine employs around 70 Iluka personnel and 113 contractors. The mine site at WRP stretches over a distance of 14.5 kilometres with various deposits having a width of up to 130 metres. The deposit has a depth from six metres to three metres with an average overburden depth of around 30 metres. Dewatering has to be employed where the ore dips below the water table.


Mined ore is fed into the processing plant to rid it of any oversized material after which it is pumped into a thickener to remove the clays and slimes. This slurried ore is then pumped into the wet concentrator to processes it into heavy mineral concentrate. The concentrate is transported to Iluka's mineral separation plant at Hamilton via truck transport to Hopetoun where it is loaded onto railway wagons to be taken by rail the rest of the distance to Hamilton.


WRP Concentrate Taken to Hamilton Plant to Have Minerals Separated

Thirty trucks a day carry 50 tonnes of concentrate each from the mine-site to the specially constructed Hopetoun rail loading facility for loading onto trains pulling 15 wagons at a time, seven days a week, loaded with 1,450 tonnes of concentrate at the one time. These railway wagons take the concentrate to the Hamilton mineral separation plant. Once the heavy mineral concentrate arrives at the Hamilton plant it is separated into ilmenite, zircon and rutile.


WRP mine workers are housed in an 185 personnel accommodation village that has been built at Ouyen while employed on the Woornack, Rownack, Pirro mineral sands mining project.
 

Iluka Resources

Iluka Resources is focused on mineral sands exploration, project development and operations.Being a major producer of zircon and high grade titanium dioxide products of rutile and synthetic rutile.Iluka employs around 800 people across its projects and is a Perth based company.Some of Iluka...........read more

ADDRESS

Iluka Resources
Level 23, 140 St Georges Terrace
Perth, WA 6000

GPO Box U1988
Perth, WA 6845

OTHER INFO

Phone08 9360 4700
fax08 9360 4777

View Iluka Resources Page

We Currently have No Jobs Specified for

WOORNACK ROWNACK PIRRO

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Woornack Rownack Pirro

Y Fronts teaser banner MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

Downer Group