WILCHERRY HILL

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About: The Wilcherry Hill magnetite mine in the Northern Eyre Peninsula Region of South Australia, 40 kilometres north of Kimba and 130 kilometres from Whyalla, is expecting to export one million tonnes of iron ore in its first year of production and doubling this to two million tonnes in its second year.

The Wilcherry Hill Project is a Joint Venture Operation Involving IronClad Mining and Trafford Resources


The Wilcherry Hill mine is being developed by IronClad Mining Limited as a joint venture with Trafford Resources. Ironclad Mining Limited was listed on the Australian Securities Exchange in July 2007 for the purpose of developing an iron ore mine at the Wilcherry Hill deposit. In 2007, the joint venture partner, Trafford Resources, indicated the Wilcherry Hill iron ore project would be a viable operation depending on iron ore prices at the time. Since that time the project has been progressively developed by improving the resource definition and undertaking environmental, metallurgical, infrastructure and social studies and approvals.

Wilcherry Hill Tenements Cover 976 Square Kilometres

The Wilcherry Hill project consists of four tenements that cover an area of 976 square kilometres and contains natural bushland as well as low density sheep grazing on land held by the Buckleboo and Nonning sheep stations. Access is gained from the Eyre Highway from Kimba, followed by graded service roads and pastoral station tracks.

Wilcherry Hill Workers to be Accommodated in Kimba

The Wilcherry Hill project contains an iron ore resource of 24.3 million tonnes grading at 40 percent of iron a tonne that is able to be mined as an open cut operation because of its near surface iron mineralisation. It is planned to have production commence in 2014. A mine workers village is to be provided at Kimba and the iron ore exported out of Lucky Bay by means of a transhipping system of ship loading.
Wilcherry Hill Mine's Three Development Stages:

> Stage one of the mining operation will be to develop a low cost direct shipping ore (DSO) producing up to one million tonne a year. Stage two will begin the beneficiation phases needed to to produce magnetite concentrate. The first two years of Wilcherry Hill stage one DSO production has already been pre-sold to Chinese steel mills under a sales contract and marketing agreement. Fifty percent of years three and four has been contracted through an offtake arrangement with Chinese company, New Page Investments.
> Stage two will involve the increasing of production to between four and five million tonnes a year by combining the DSO product with two million tonnes of magnetite concentrate by the end of year three.
> Stage three will involve the incorporating of the Hercules project with Wilcherry Hill mine production. The Hercules ore body has an indicated and inferred JORC resource of 198 million tonnes and is expected to increase total output to between 10 and 12 million tonnes of iron ore a year by 2015/16.

IronClad Mining Limited is proceeding with the development of the Wilcherry Hill iron ore and manganese projects and have been give approval by the South Australian government to also develop the port of Lucky Bay for its export requirements.
 


IronClad Mining Limited

IronClad Mining Limited (“IronClad”) was listed on the ASX in July 2007 for the sole purpose of developing the Wilcherry Hill Iron Project, located 130km from the steel making town of Whyalla in South Australia. The company currently share a joint venture 80:20 of their project Wilcherry with...........read more

ADDRESS

IronClad Mining Limited
Level 2, 679 Murray Street
West Perth, WA 6005

OTHER INFO

Phone0894851040
fax0894851050

View IronClad Mining Limited Page

We Currently have No Jobs Specified for

WILCHERRY HILL

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Wilcherry Hill

Y Fronts teaser banner MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....