About: The Westmoreland Uranium Project is located in northern Queensland, adjacent to the border with the Northern Territory, about 400 kilometres north north west of Mount Isa. The project is wholly owned by a private company, Tackle Resources Pty Ltd, a fully owned subsidiary of Canadian based, Laramide Resources Limited. Laramide is listed on both the Toronto Stock Exchange and the Australian Securities Exchange.

Westmoreland Uranium Project Contains Large Resource Base

The Westmoreland Uranium Project contains a mineral resource of 36 million pounds of uranium within an ore body totaling 18.7 million tonnes with an average grade of 0.089 percent uranium. The project also contains another inferred mineral resource of 15.9 million pounds of uranium contained within an ore body of nine million tonnes with an average grading of 0.083 percent uranium.

Westmoreland Uranium Project can be a low Cost Producer of Uranium

The Westmoreland Uranium Project is regarded as being one of the best development stage uranium deposits in the world that is not under the control of a major mineral producing company. It is also one of only a small number of known uranium deposits in the world that is able to be further developed economically under present (2015) world uranium prices.

Westmoreland to be Developed as an open cut Mining Operation

The Westmoreland Uranium Project, that is able to be developed as an open cut mining operation, is currently at an advanced exploration and delevopment stage, as significant work in these areas has been carried out in the past by the project's former owner Rio Tinto. Laramide acquired the Westmoreland Uranium Project from Rio Tinto in the latter half of 2005. Since that time Laramide has further advanced the project through carrying out a series of exploratory drilling programs that have allowed it to update its resource estimates, as well as carry out further metallurgical and environmental studies.

Around 80 percent of the uranium resource held within the Westmoreland Project lies within 50 metres of the surface, this will allow for a low stripping ratio open cut operation to be undertaken in order to economically access the deposit. Metallurgical tests carried out to date have indicated a high uranium recovery is possible using conventional technology.

Westmoreland Uranium Deposits Discovered by MIM in 1956

The Westmoreland Uranium Project was discovered in 1956 by Mount Isa Mines (MIM) . It was owned by Rio Tinto from 1990 to 2000. During its ownership period Rio Tinto focused on producing a pre-feasibility study on three uraniun deposits within the Westmoreland tenements, namely the, Junnagunna, Huarabagoo and Redtree deposits. The project area contains a total of 42 uranium occurrences. However, the Rio Tinto work showed the mineralisation within the Westmoreland Uranium Project had high uranium recovery with low acid consumption and was amenable to acid leaching technology.

Laramide have more recently completed, in 2011, the collection of over two years of baseline environmental data. This data will allow Laramide to place the Westmoreland Uranium Project in a position to be able to quickly complete an application for environmental approval when necessary. On receiving environmental approval Laramide will then be in a position to move the project towards the undertaking of a feasibility study and start the next development stage of the Westmoreland Project.

Laramide Resources Ltd

Laramide Resources is listed on both the Toronto Stock Exchange and the Australian Securities Exchange.The Company has the Westmoreland Uranium Project in north west Queensland, that is able to be developed as an open cut mining operation. The project is currently at an advanced exploration and...........read more

ADDRESS

Laramide Resources Ltd
Level 4, 67 St Pauls Tce
Spring Hill, QLD 4009

OTHER INFO

Phone0738313407
fax0738313409

View Laramide Resources Ltd Page

We Currently have No Jobs Specified for

WESTMORELAND

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Westmoreland

Y Fronts teaser bannerDowner Group MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

iComplii