doing fifo financially smart
HomeMinesWAWattle Dam
LEVEL 1, 130 ROYAL ST EAST PERTH WA , 6004
P: 08 9202 1127 F: 08 9202 1138
info@rameliusresources.com.au
www.rameliusresources.com.au

WATTLE DAM

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The Wattle Dam underground gold mine was located 25 kilometres south east of Kambalda, in the Eastern Goldfields of Western Australia. It began life as an open pit operation in March 2006 and became an underground mine in May 2009. The first production from the underground mine occurred in November 2009. Gold production at the Wattle Dam mine finally ended in October 2012 with the mine site infrastructure being dismantled and the area surrounding the site being rehabilitated.


While the Wattle Dam mine was in operation it had consistently produced more than 20,000 ounces of gold a quarter, making it the flagship gold mining operation of Ramelius Resources Limited. A record quarterly production level was reached in the December quarter of 2010 when 26,668 ounces of gold was produced.


Successful diamond drilling in 2011 extended the life of mine to beyond 2013 but in 2012 it became obvious the grades at the mine had become extremely erratic and similar grades were expected to continue for the remainder of the mines life. It was then decided by Ramelius Resources Limited, to cease operations at Wattle Dam in the third quarter of 2012.


The Wattle Dam gold mine became one of the lowest cost gold mines in Australia, producing some of the highest grades of gold and keeping its costs below $500 an ounce. The Wattle Dam mine produced over 100,000 ounces of gold for the financial year ended June 2011 while developing the decline to 340 metres below the surface.


Mineralised ore from the Wattle Dam Mine was processed at the Burbanks Gold Treatment Plant that is located eight kilometres from Coolgardie and 65 kilometres from the Wattle Dam mining operation. The mill is designed with a conventional CIL (carbon-in-leach) circuit and began treating Wattle Dam ore in May 2007. It has a capacity of treating up to 180,000 tonnes of ore a year.


In May 2012, when it became clear that the Wattle Dam Mine closure was imminent, Ramelius Resources Limited, set about progressing a number of gold mining projects that would serve as a replacement source of gold bearing ore, two such deposits were the Coogee and Vivien ore bodies. Another gold mine, Mount Morgan, began operations in March with throughput increasing in line with expectations. The grades were also improving at Mount Morgan as the pits were getting deeper.


The extension plan for the Wattle Dam underground gold mine was based on developing Block C and Block D zones to give the mine its longest possible production life. It had been modelled on the interpretation of diamond drilling results taken over the previous 12 months that predicted an ore body containing 216,000 tonnes of mineralised ore in Block D and 129,000 tonnes of ore from Block C. Both zones were predicted to produce around 20 grams of gold a tonne. The nature of the gold deposits at Wattle Dam defied normal JORC requirements and only became proven while actual mining operations were being carried out. Results were excellent in the earlier years of mining at the site and the company saw no reason why this high grade level could not be continued with the extension project going ahead.

Ramelius Resources

Ramelius Resources is an exploration company with various projects in WA and Qld.

ADDRESS

Ramelius Resources
Level 1, 130 Royal St
East Perth, WA 6004

PO Box 6070
East Perth, WA 6892

OTHER INFO

Phone0892021127
fax0892021138

View Ramelius Resources Page

We Currently have No Jobs Specified for

WATTLE DAM

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Wattle Dam

Y Fronts teaser banner MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....