National Pump and energy
HomeMinesNSWUlan
LEVEL 38, 1 MACQUARIE PLACE SYDNEY NSW , 2000
P: 02 9253 6700
info@glencore.com
www.glencorexstrata.com

ULAN

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The Ulan Coal Mines Limited (UCML) in the Western Coalfields of NSW belongs to Xstrata Coal NSW, a fully owned subsidiary of GlencoreXstrata. Ulan are currently in the process of re-establishing and extending its open cut mining operation as well as the continued operation of its two underground mines, the new Ulan West mine and the more established Ulan No 3 mine.


Ulan Mine 21 Years in the Making
The exploitation of the Ulan coal seam has been contemplated for the last 21 years as an open cut and long wall underground operation. The operation, known as the Ulan Mine Complex, includes the land holdings under the mining lease, land management as well as all underground and open cut mining operations taking place at the site.


Ulan Open cut Mine to Have a Life of no More Than 11 Years
Open cut mining at the Ulan Complex will only be undertaken from seven to 11 years after production commences. Underground mining at the site will continue for the life of the mines. The open cut will incorporate a mix of dragline and truck/loader methods of mining whereas the underground operations are incorporating continuous mining and long wall retreat technology. This method of mining coal underground allows the mining of the highest quality of coal as it only extracts the bottom three metres of the Ulan coal seam. Primary coal extraction, or development mining, is carried out with the use of a continuous miner and shuttle car process to develop long-wall panels. Secondary coal mining of the Ulan seam uses long-wall methods operating a width of around 400 metres. The first such panel was mined in 2005. this made it the first of its kind to be undertaken in any mine operating in the Southern Hemisphere.


Quality Ulan Coal Goes Unwashed
The removal of the bottom three metres of the coal seam at the Ulan Mine lessens the need for coal washing whereas 30 percent of coal taken to the surface requires washing before it becomes export quality coal. Coal is taken to the surface of the mine via conveyor where it is stockpiled. The coal not requiring washing is immediately crushed and placed in finished product stockpiles to await rail loading that takes it off site. Ash coal it trucked to the coal washing plant from where it is picked up by a reclaimer and taken to the CHPP (coal handling preparation plant).


Ulan CHPP is State of Art
The Ulan coal handling and preparation plant has a 1,800 tonnes an hour raw coal receival capacity that allows for raw coal stockpiling, or re- claiming from the stockpile, by means of a bucket wheel reclaimer. A 1,000 tonne surge bin distributes coal feed to a 1,200 tonnes an hour between two modules. The CHPP consists of dense medium baths, dense medium cyclones and water washing cyclones that separate rejects from the quality coal product to satisfy both export and domestic requirements. Course rejects are taken from the receival bin by truck and returned to the mining cycle. Tailings are then thickened and pumped into a reject emplacement dam. The product coal is either railed to the Port of Newcastle coal terminal for export or railed to the domestic market.


The Ulan coal mining complex's need to increase its ROM coal production has seen it expand to a 20 million tonnes a year mining operation. This has required the upgrading of the CHPP to accommodate three modules. The third module increased the amount of coal washing as did the modifications made to the two existing modules. The third module is to be located on the northern side of the CHPP.

Note- GlencoreXstrata was formed following a merger of Glencore International and Xstrata, the merger was completed in May 2013. But a decision was made by the Company's shareholders during the annual general meeting and the announcement was made in May 2014 that Glencore will drop Xstrata and be simply known as Glencore.

Glencore

Glencore dates back to 1974 as Marc Rich & Co, focused on minerals, metals and crude oil. In the 1980's Glencore added coal to their portfolio. Glencore is one of the worlds largest natural resource companies with more than 90 offices in over 50 countries, over 150 mining and metallurgical sites...........read more

ADDRESS

Glencore
Level 38, 1 Macquarie Place
Sydney, NSW 2000

OTHER INFO

Phone0292536700

View Glencore Page

We Currently have No Jobs Specified for

ULAN

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Ulan

Y Fronts teaser banneriComplii MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

iComplii