About:

The Tutunup South, ilmenite, rutile and zircon open pit mine, 195 kilometres south of Perth and 15 kilometres south of Brusselton, in Western Australia had no sooner got up and running when world demand for its products slumped and mine owner Iluka was forced to close operations until demand once again improves.


Watpac Civil and Mining Awarded the Tutunup South Mining Contract by Iluka


The contract to develop the mine and to operate it for the first five years wasawarded to Watpac Civil and Mining who commenced production at Tutunup South in June 2011. The mine was producing chloride ilmenite that was used as a feed source to Iluka's synthitic rutile production. The ilmenite from the mine was processed at Iluka's Capel dry plant. The non- magnetic zircon and rutile that was also produced at the Tutunup South/Iluka mine was processed at the Iluka Narngulu Mineral Separation Plant that was always dependant on plant availability and market demand.


Weak Market Conditions Force Iluka to Make the Tutunup South Operation Idle


The action taken by Iluka to slow the company's production of these products has been brought about as a result of the weak market conditions that existed throughout 2012 which saw the company producing more than it was able to sell. Despite the company slowing production during 2012 it still wasn't enough and more drastic action such as closing the Tutunup South /Iluka Mine was found to a necessary action. However, it is believed 2013 will see things start to improve as Iluka draws down on stockpiled products and starts processing concentrate stocks. It is believed that this will be enough to see production pick up again in 2014.


Market not Able to Absorb Tutunup South Production


Site works began at the Tutunup South /Iluka Mine in the final quarter of 2010 and production began at the mine in June 2011, a month earlier than expected. It's first production went mainly towards supplementing the company's feed sources for its Synthetic rutile production. The heavy mineral grading from the mine was around 10 percent. Although the Tutunup South/Iluka operation produced around 0.11 million tonnes of ilmenite in 2011 and 0.17 million tonnes in 2012. the market was not able to absorb it.


Tutunup South has Life of Mine of Five Years


Iluka had planned for the Tutunup South/Iluka sands mine to contribute 1.2 million tonnes of heavy mineral concentrate to the company's total production during the life of the mine. The Iluka North Capel Processing Plant was to handle all of Tutunum South Mine's production of ilmenite for feedstock requirements for its synthetic rutile kiln that was set up to handle 200 tonnes of ore an hour. This level of production was planned to last for the next four to five years.
The sand mining carried out at Tutunup South was undertaken by means of dry mining with wet concentrate. The heavy metal concentrate was then taken by truck to the North Capel Processing Plant for treatment before being taken to the Bunbury port for exporting overseas. Just prior to closure, the Tutunup South/Iluka Mine had reached its full production expectations.

Iluka Resources

Iluka Resources is focused on mineral sands exploration, project development and operations.Being a major producer of zircon and high grade titanium dioxide products of rutile and synthetic rutile.Iluka employs around 800 people across its projects and is a Perth based company.Some of Iluka...........read more

ADDRESS

Iluka Resources
Level 23, 140 St Georges Terrace
Perth, WA 6000

GPO Box U1988
Perth, WA 6845

OTHER INFO

Phone08 9360 4700
fax08 9360 4777

View Iluka Resources Page

We Currently have No Jobs Specified for

TUTUNUP SOUTH ILUKA

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Tutunup South Iluka

Y Fronts teaser bannerDowner Group MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....