Downer
HomeMinesWASummit
LEVEL 30, 44 ST GEORGES TCE PERTH WA , 6000
P: 08 9215 7888 F: 08 9215 7889
info@focusminerals.com.au
www.focusminerals.com.au

SUMMIT

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The Summit underground gold mine in the Eastern Goldfields of Western Australia is now owned by Focus Minerals Limited who's major shareholder is the giant Chinese mining company, Shandong Gold Group. Focus Minerals Limited acquired the mine from its former owner Crescent Gold in 2011.


The Summit Mine has Been Closed Since 2009


The Summit underground mining operation is known as the Lancefield Project and it entails the de-watering of the old underground mine before production can be re-commenced. Mining in the form of open pit and underground working has taken part in this locality since the 1890's. The area was mined by Western Mining Corporation (WMC) between 1890 and 1994. Crescent Gold purchased the Lancefield Deeps from Metix Resources Limited in 2009 and immediately renamed the deposit “Summit.” The mine has been closed since 1994.


Summit is Part of the Laverton Gold Mining Operations


The Summit Mine is part of the Laverton Gold Operations that include the; Sickle, Euro, Grouse, West Laverton, Admiral Hill, Castaway, Lord Byron and the Fish gold deposits, as well as the Laverton Gold Processing Plant. The total project is planning on producing 2.1 million tonnes of gold ore annually.


Water has to be Pumped From the Summit Mine Before Re- commissioning can Occur


Before the feasibility of re-opening the Summit underground mine is complete the water in the mine has to be pumped along a 1,100 metre pipeline from the Summit Mine main shaft to the South Lancefield Open Pit that is now closed. The water level in the Summit Mine is located 135 metres below the surface with an estimated volume of 1.58 GL.
The water will be removed from the Summit Mine with a 10 inch deep well bore pump that will be lowered down the main shaft to a depth of 300 metres, the 100 volt power needed to run the pump will be supplied by a 750KVA diesel generator.


Summit Mine had Previously Produced Over One Million Ounces of Gold


Once mining resumes at the Summit underground mine it is expected to produce between 50,000 and 70,000 ounces of gold a year. Before the mine was closed in 1994 it had produced more than one million ounces of gold, but production ceased owing to the low gold price at the time that was paying only $380 an ounce.


Summit Mine is a Long Term Development


The re-opening of the Summit Mine is being looked upon as being a long term development asset. The company is also considering building its own gold concentrator at its Barnicoat Plant and having the concentrate treated at the nearby Granny Smith facilities that is used under an agreement with Barrick Gold.


Large Gold Reserves Back Re-opening of Summit Gold Mine


In 2010 the then Laverton Project owner, Crescent, announced a 140 percent increase in its gold reserves in the area. It stated it had discovered a probable gold ore reserve of 6.5 million tonnes grading at 2.1 grams a tonne that would realise 445,000 ounces of contained gold. This announcement increased its previously stated reserve by 260,000 ounces
from the previous estimate of 185,000 ounces.

Focus Minerals

Focus Minerals is Australia's number one most dynamic Gold producer , operating four mines across Australia and is the two largest Gold production regions. In the last few years Focus has built up a reputation for its ability to develop and commission on new mines reviving the historic Coolgardie...........read more

ADDRESS

Focus Minerals
Level 30, 44 St Georges Tce
Perth, WA 6000

PO Box Z5422
Perth, WA 6831

OTHER INFO

Phone08 9215 7888
fax08 9215 7889

View Focus Minerals Page

We Currently have No Jobs Specified for

SUMMIT

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Summit

Y Fronts teaser banner MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

iComplii