HomeMinesNSWRocglen
LEVEL 28, 259 GEORGE STREET SYDNEY NSW , 2000
P: 02 8507 9700 F: 02 8507 9701
www.whitehavencoal.com.au

ROCGLEN

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The Rocglen open cut coal mine near Gunnedah in New South Wales is operated by Whitehaven Coal Mining Pty Ltd (WCMPL) on behalf of the owner, Whitehaven Coal Limited (WCL). The mine is situated on Wean Road, 28 kilometres north of the town of Gunnedah. It 's production of low phosphorus, low sulphur, medium to high ash thermal coal for the export market, began in late 2008.


Mining at the Rocglen Open Cut Coal Mine Assured Until 2016
The Rocglen Mine has a run of mine (ROM) production rate of 1.2 million tonnes a year from a coal reserve sufficient to keep the mine in full production until 2016. Coal production commenced at the Rocglen Mine in 2008, soon after the mining lease was granted and construction began on stripping the overburden and building the necessary infrastructure.


Coal Production at the Rocglen Mine Limited to a Maximum of 1.5 Million Tonnes a Year
The Rocglem Mine approval allows for the mining of 18 million tonnes of ROM coal at a rate of no more than 1.5 million tonnes a year. This included the crushing and screening of the ROM coal at the mine site before it is transported to the Whitehaven Siding CHPP (coal handling and preparation plant), near Gunnedah. The approval allows for a land area of 115 hectares to be disturbed during the open cut mining activity taking place at the site.


Rocglen Coal Exported for Power Generation Purposes
All coal produced at the Rocglen open cut operation is exported for use by power generation or heating industries in Asian countries. The coal is sold either raw or washed and sized to no more than 50mm. It is described as being a high volatility coal which will produce a medium sulphur thermal or PCI grade coal with ash percentages as low as 10 percent (low ash PCI) to as high as 25 percent (high ash thermal).


Rocglen Expansion Approved in 2011
In late 2011 the New South Wales Government approved Whitehaven Coal's application to expand the Rocglen open cut mining operation. The application for the expansion was made to allow the open pit to access an extra five million tonnes of coal. It also asked for an increase to be made to the size of the mines northern emplacement to allow it accommodate a further 12 million bcm (bank cubic metres) of overburden. The approval also allowed for relocation on mining infrastructure as it became necessary, as well as some of the coal being produced at the Rocglen Mine being transported to Whitehaven's Canyon site for stockpiling, crushing and dispatching for domestic use.


Low Coal Prices Force Employment Cuts at the Rocglen Mine
The continuing high value of the Australian dollar, when compared to the American dollar, along with continuing low world prices for thermal coal that has been worrying Whitehaven Coal Limited for some time, came to a head in March 2013 when the company laid off some of its Rocglen employees. The cuts were made along with other cost cutting initiatives such as reduced stripping ratios, to ensure the mine remained viable. Whitehaven also cut its truck haulage fleet in half at the same time as part of its lowering of cost overheads.
 

Whitehaven Coal

Listed in 2007, Whitehaven Coal is a leading coal producer in NSW's Gunnedah Basin. With a workforce which will surpass 1100 people in the next five years, owns three operating open cut mines at Werris Creek, Tarrawonga and Rocglen, the Narrabri North underground mine and construction has begun at...........read more

ADDRESS

Whitehaven Coal
Level 28, 259 George Street
sydney, NSW 2000

PO Box R1113
Royal Exchange, NSW 1225

OTHER INFO

Phone0285079700
fax0285079701

View Whitehaven Coal Page

We Currently have No Jobs Specified for

ROCGLEN

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Rocglen

Y Fronts teaser banneriComplii MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....