PORPHYRY

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The first stage of Saracen Mineral Holdings ambition to become a mid tier Australian gold producer commenced with the re-commissioning of the old Porphyry-Edjudina working at its Carosue Dam Gold Project at South Laverton in the Eastern Goldfield Region of Western Australia.


Five Open Cut Mines, Including the Porphyry-Edjudina Mine, Make up the Carosue Dam Project
The Carosue Dam Project involves the operation of five open cut gold mines beginning with the Porphyry-Edjudina Mine. A mine that has a history of producing a total of 144,000 ounces of gold the last time it was operational. The beginning of work at the Porphyry-Edjudina mine coincided with the wet commissioning of the Carosue Dam Gold Processing Plant where surface stockpiles and Porphyry ore are milled. The other mines involved in the project include; Wallbrook, Deep South, Enterprise and Whirling Dervish. All are to be mined over the next three to five years.


New Village Accommodation Built at the Porphyry-Edjudina Mine Site
The Carosue Dam Project employs about 200 contractors and staff, with separate accommodation being built in 2011 to house an additional 80 people at Edjudina, close to the Porphyry-Edjudina operation.


Underground Mine Worked via a Room and Pillar Method
In the 1980's, mining had been carried out at Porphyry by Edjudina Gold Mines. This operation included an open pit and underground mine that was mined using a room and pillar method. It was a shallow working following a dipping, near surface, lode. A lode that had previously been worked from the surface. The underground development followed the ore, a practice that resulted in quite low capital costs. However, underground mining ceased at the Porphyry-Edjudina Mine in the late 1980's because of the low gold price at the time.


Porphyry-Edjudina Mine Needed De-Watering Before Work Could Restart
Recent activity at the Porphyry-Edjudina pit required substantial de- watering before any work could commence and this revealed the existing portal and adits into the previous workings. A bore was sunk into the deepest area of the mine to pump the water out of the underground workings before a feasibility study could be undertaken as to the likelihood of it re-opening. Underground remedial work would require improvements to the decline, a hanging wall ventilation drive and a secondary means of egress.


Large Underground Resource at the Porphyry-Edjudina Mine
It is expected that any ongoing underground mining will follow that practised during the 1980's to best exploit the underground resource. The underground resource at the Porphyry-Edjudina Mine is presently set at 1.3 million tonnes of ore grading at 4.1 grams a tonne that would realise 171,000 ounces. Reserves are put at 634,000 tonnes grading at 3.4 grams a tonne that would return 70,000 ounces of gold.
Same Haulage Road Links All Mines to Carosue Dam Gold Processing Plant
The haul road was upgraded in 2010 with a new section being built between the processing plant at the Carosue Dam site and the Porphyry- Edjudina Mine, a distance of 48 kilometres. The same haul road connects the other four mines to the same processing plant.
 

Saracen Minerals

The Carosue Dam project situated near Kalgoorlie in WA is owned by Saracen and with its gold production rising its expected to set Saracen Holdings as a mid-tier Australian gold producer.

ADDRESS

Saracen Minerals
Level 4, 89 St Georges Terrace
Perth, WA 6000

GPO Box 2563
Perth, WA 6001

OTHER INFO

Phone08 6229 9100
fax08 6229 9199

View Saracen Minerals Page

We Currently have No Jobs Specified for

PORPHYRY

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Porphyry

Y Fronts teaser banner MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....