doing fifo financially smart
HomeMinesNZPohokura
167 DEVON STREET WEST NEW PLYMOUTH NZ , 4343
P: 6467 587 609 F: 6467 577 301
www.stos.co.nz

POHOKURA

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The Pohokura offshore gas and condensate field is located in the Taranaki Basin north east of New Plymouth in 35 metres of water off New Zealand's South Island. It is jointly owned by Todd Pohokura (26 percent), Shell Petroleum Mining (18 percent), Shell Exploration NZ (30 percent) and OMV (26 percent). The enterprise is operated by Shell Todd Oil Services.

Pohokura Development Completed by 2008
The Pohokura gas and condensate field, where development was completed in 2008, is located 3,600 metres below the sea bed extending north west from the Taranaki coast. It covers an area that is 16 kilometres long and five kilometres wide. The field was discovered by Fletcher Challenge Energy in 2000. The first well drilled, Pohokura-1, penetrated a gas column measuring 130 metres and had a flow of 17.6 million standard cubic feet of gas a day. The Pohokura-2 well that was drilled five kilometres from Pohokura-1 near the centre of the field penetrated a 115 metre gas column with a flow of 35.5 million standard cubic feet of gas a day during drill stem testing.

Pohokura Acquired by Shell From Fletcher Challenge Energy in 2001
Shell acquired Fletcher Challenge Energy's assets in 2001 and subsequently drilled three onshore wells located at Montunui and five more from an offshore platform. The total Pohokura field has an estimated reserve of 884PJ (petajoule) of natural gas and 44 mmbbls (million barrels of liquids) of condensate. An amount that makes it one of New Zealand's largest condensate fields that would allow it to supply up to 40 percent of the country's natural gas requirements.

First Pohokura gas fed Into Network in 2006
The production station servicing the five Pohokura wells is located on the Motunui coast and the first gas was fed into the network servicing the North Island in September, 2006. Both the onshore production station and the offshore platform are controlled remotely from the offices of Shell at New Plymouth.


The Pohokura gas and condensate field infrastructure includes the wellhead platform and an onshore gas plant that are connected via a sub- sea pipeline. The first commercial gas was produced in September 2006 from three onshore wells. Gas and condensate began flowing from the first of the then five offshore wells in March 2007. In 2009 the field produced 4.3 mmbbl of condensate and oil and 58.5bcf of gas. The natural gas leaving the Pohokura production station feeds into the North Island gas network. The condensate is separated at the production station and piped to storage tanks at Omata, near New Plymouth, from where it is transported by oil tankers to either the Marsden Point refinery, or other refineries offshore.


Technip Australia Awarded Pohokura's Major Development Contract
The contract to install the Pohokura wellhead platform as well as the supply and installation of all umbilicals and flexible lines linking the wells with the platform was carried out by Perth based, Technip Australia. The flexible lines and umbilicals were manufactured at the company's plants at Newcastle in Britain and Le Trait in France. Technip also managed various subcontracts during the development stage of the project. The group's dynamically positioned vessel, the 'Venturer' was used for offshore construction work.
 

STOS

Shell Todd Oil Services Limited is a joint venture between Shell, Todd Energy, and OMV based in Taranaki which operates a number of gas fields (including Maui and Kapuni), stations and a tank farm.The company has been operating for over 50 years and throughout this time has set high standards for...........read more

ADDRESS

STOS
167 Devon Street West
New Plymouth, NZ 4343

OTHER INFO

Phone6467587609
fax6467577301

View STOS Page

We Currently have No Jobs Specified for

POHOKURA

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Pohokura

Y Fronts teaser banneriComplii MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....