PNG LNG PROJECT

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The PNG LNG Project remains on schedule to deliver its first liquified natural gas (LNG) product to the export market in China and Japan by mid-2014 as previously planned. The project is a 6.9 million tonne a year of LNG project that will be operated by Esso Highlands Limited, a subsidiary company of ExxonMobil Corporation. Gas for the project is being sourced from the Juha, Angore and Hides gas fields as well as from associated gas in the Gobe Main, Moran and Agogo oil fields.

PNG LNG Project to Produce Nine Trillion Cubic Feet of Natural gas Over 30 Years
It is predicted the PNG LNG Project will produce more than 200 million barrels of associated liquids along with 9 trillion cubic feet of natural gas during the projects 30 year life span. Gas from the fields will be conditioned in the Papua New Guinea Highlands before it is taken by a gas pipeline to the liquefied natural gas plant for further processing prior to it being loaded onto ocean going tankers for export to the company's international customers.

PNG LNG Project Onshore and Offshore Pipelines now Complete
It was announced in March 2014 that the 292 kilometre onshore pipeline taking the gas from the PNG Highlands to the coast had been completed by the onshore pipeline contractor SpieCapag. This pipeline will take the gas from the Hides Gas Conditioning Facility to the Omati River where it will be connected to the 407 kilometre offshore pipeline that has already been completed by contracting company Saipem. The offshore pipeline takes the gas to the LNG Processing Plant and Marine Facility being built by contractors JGC and Chiyoda at Caution Bay, on the Central Province's south coast, 20 kilometres north west of Port Moresby.


The recently completed onshore pipeline rises to a height of 2,100 metres above sea level on its way to the coast and was constructed in challenging conditions containing steep terrain, high rainfall, remote locations and large areas of flooded swampland. The construction of the pipeline has taken four years to complete employing over 5,000 Papua New Guinea workers recruited from local communities from Hides to Omati. The onshore pipeline ranges in diameter from 34 to 32 inches.

PNG LNG Project Upstream Infrastructure Completed
The upstream infrastructure of the PNG LNG Project has already been completed by contractors Clough Curtin Brothers as a joint venture. CBI Clough Joint venture partners are currently constructing the Hides Wellpads and Hides Gas Conditioning Plant. Nabors Drilling continues to carry out drilling activities concerning the project. The Komo airfield servicing the project has been completed by McConnell Dowell and Consolidated Contractor Group, the airfield is 3.2 kilometres long, making it the largest runway in Papua New Guinea.

PNG LNG Project Long Term gas Agreements Signed
Gas produced from the PNG LNG Project is to be supplied to four major customers under long term contracts. These companies being; CPC Corporation, The Tokyo Electric Power Company Incorporated, Osaka Gas Company Limited and China Petroleum and Chemical Corporation (Sinopec).


The PNG LNG Project is a Joint Venture LNG producing and marketing
operation that involves the following companies: ExxonMobil, which is also the operator, has a 33.2 percent interest in the project, Oil Search (PNG) Limited has 29 percent, National Petroleum Company of PNG (PNG Government) holds 16.8 percent, Nippon Oil has 4.7 percent and MRDC (Papua New Guinea landowners) holds a 2.8 percent interest.
 

ExxonMobil

ExxonMobil group of companies are subsidiaries of Exxon Mobil Corporation, who are the world leaders in petroleum and petrochemicals.Dating back over 100 years ExxonMobil is in exploration and production of oil and gas, petroleum refining and supply of fuels. They also have affiliated companies...........read more

ADDRESS

ExxonMobil
12 Riverside Quay
Southbank, VIC 3006

OTHER INFO

Phone0386338444

View ExxonMobil Page

We Currently have No Jobs Specified for

PNG LNG PROJECT

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Png Lng Project

Y Fronts teaser banneriComplii MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

iComplii