PEARL CROYDON

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About: A new open pit gold mine in Central Victoria is on the verge of coming on line as all necessary approvals from all sources have now been signed off on. The mine, Pearl Croydon, that is owned by Octagonal Resources Limited, is located 10 kilometres south west of the gold mining town of Maryborough, within the Maryborough State Forest.

Pearl Croydon Mine Situated South of Paddy's Ranges National Park
Octagonal Resources Limited is to operate the Pearl Croydon mine through it wholly owned subsidiary, Highlake Resources Pty Ltd. The gold deposit to be mined is situated south of the Paddy's Ranges National Park. It contains a mineralisation resource of 571,000 tonnes grading at 2.9 grams of gold to a tonne which will reveal a total of 53,000 ounces of gold. The ore mined from the open pits is to be taken by road transport to the company's Porcupine Flat Gold Processing Plant at Maldon.

Pearl Croydon Gold Mine to Comprise Eight Individual Open Pits
The Pearl Croydon gold mine will consist of eight open pits that will be mined within a 200 metres by 1,500 metres area. The largest of the pits will be 60 metres deep, 100 metres wide and 250 metres long. Two open pits are to be initially established, one being the Pig and Whistle pit and the other the London Hill pit. These pits are to be mined to a depth of 15 metres and 30 metres respectively and are expected to be completed before the end of 2014. These two pits will produce 110,000 tonnes of waste material and 23,000 tonnes of gold bearing ore. The ore will be taken to the Maldon processing plant in 30 tonne trucks and dog trailers using Possum Gully and the Old Avoca Road to Maryborough and from Maryborough to Maldon via Carisbrook and Baringhup.

Pearl Croydon Mine to Operate day Shifts Only Five Days a Week
All waste rock produced during the mining operation is to be stockpiled onsite and will be used again as fill when mining of a particular pit is completed. Mining at the Pearl Croydon mine is to be carried out on a day shift basis therefore haulage trucks will only be on the road during working hours on weekdays. It is planned to transport 2,000 tonnes of ore a month to the Maldon gold processing plant. This will require four truck movements each working day.

Pearl Croydon Mine to Use the Minimum of Mining Equipment
Mining equipment to be used at the Pearl Croydon mining operation will comprise one excavator, one loader and two articulated rear dump trucks. The excavator will be used to remove all waste and oxidised ore from the pits. The mine will undertake all road maintenance within the State Forest area that it uses. All public roads used by the haulage trucks will be maintained by the Central Goldfields Shire Council with extra costs caused by the mines haulage operation paid for by Octagonal Resources Limited.

Octagonal Resources Limited is an Australian operated and owned public company that is listed on the Australian Securities Exchange (ASX). It was established in 2010 to develop gold producing operations in Central Victoria to supply gold bearing ore to the Maldon located Porcupine Flat Gold Processing Plant.
 


Octagonal Resources

A gold focused company with exploration and mining assets located in Western Australia and Victoria.The company owns nine exploration licences located in Western Australia with two of their projects being Union Hill and Pearl Croydon.Octagonal aims to be economically friendly as well as community...........read more

ADDRESS

Octagonal Resources
51 - 55 City Road
South Bank, VIC 3006

OTHER INFO

Phone039697908
fax0396979089

View Octagonal Resources Page

We Currently have No Jobs Specified for

PEARL CROYDON

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Pearl Croydon

Y Fronts teaser banneriComplii MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

iComplii