doing fifo financially smart
HomeMinesWANiwest Nickel Laterite
UNIT 5, 78 MARINE TERRACE FREMANTLE WA , 6160
P: 08 9336 3388 F: 08 9315 5475
enquiries@gmeresources.com.au
www.gmeresources.com.au

NIWEST NICKEL LATERITE

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About: The NiWest Nickel Laterite Project, located 50 kilometres east of Leonore, at Murrin Murrin, in the North Eastern Goldfield Region of Western Australia, is wholly owned by NiWest Limited, a fully owned subsidiary of GME Resources, a Perth based nickel exploration company.

NiWest Nickel Laterite Project has a Nickel Laterite Resource of More Than 100 Million Tonnes

The NiWest Nickel Laterite Project contains a world class nickel laterite resource of 100 million tonnes that will be mined by means of a low strip open cut mining method. The project includes seven separate tenements covering an area of 500 square kilometres.

NiWest Nickel Laterite ore to be Processed by Heap Leach Method

As a result of thorough testing and research, undertaken by GME Resources since 2010, it has been decided to develop the processing of the ore by means of a nickel heap leaching method. The research also resulted in GME Resources developing and patenting a regeneration and laterite agglomeration technology that will enable all ore types to become heap leachable.

The NiWest Nickel Laterite Project is believed to have the potential to be developed into a low cost, long term, nickel mine because of its heap leach processing method as well as it being located near established infrastructure that includes a bitumen access road, a natural gas pipeline, established mining townships, nickel refineries and railway services. The surrounding land is flat and arid which lends itself to the development of a successful heap leach processing operation.

NiWest Nickel Laterite Mine to be an Open Cut Operation

The ore body at the NiWest Nickel Laterite Project will be mined via an open cut method, after which, it will be crushed before being subjected to agglomeration and ore stacking. Multi stage leaching of the ore produced at the NiWest Nickel Laterite Project will produce LME cathode nickel as well as a cobalt carbonate precipitate after being exposed to acid regeneration, the removal of iron, neutralisation and solvent extraction before finishing up with electrowinning.

The heap leach solution circuit will include the removal of iron and the acid regeneration process through its use of a dynamic on-off pad system where the spent ore and residue will be removed and discarded into a pit.

The solution generated by the heap is known as a PLS (Pregnant Liquor Solution), this solution is then subjected to solution neutralisation where the iron content is removed. This is followed with the removing of the solvent and finally the electrowinning takes place. Cobalt is recovered by means of a separate operation that separates it from a precipitated carbonate product.

The sulphuric acid used in the process will be obtained from within the region and taken to the NiWest Nickel Laterite Project processing facility by either rail or road transport. All energy needs will be met with power produced by gas fired generators, the gas sourced from the nearby gas pipeline. Calcrete required in the neutralisation process will also be sourced locally.

NiWest Nickel Laterite Mine to Have a Life Exceeding 20 Years

The NiWest Nickel Laterite Project Heap Leach processing plant will be capable of producing 540 tonnes of cobalt carbonate and 14,000 tonnes of nickel cathode a year. It will have a mine life exceeding 20 years.

GME Resources

GME Resources is a Perth based nickel exploration company focused on the development of its 100%-owned NiWest Project, located in the Leonora district of Western Australia.The NiWest Project has the potential to be the world’s first fully integrated Nickel Laterite Heap Leach project and is...........read more

ADDRESS

GME Resources
Unit 5, 78 Marine Terrace
Fremantle, WA 6160

PO Box 1275
Canning Bridge, WA 6153

OTHER INFO

Phone0893363388
fax0893155475

View GME Resources Page

We Currently have No Jobs Specified for

NIWEST NICKEL LATERITE

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Niwest Nickel Laterite

Y Fronts teaser banner MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

iComplii