doing fifo financially smart
HomeMinesQLDNew Lenton
3 22 MAGNOLIA DRIVE BROOKWATER QLD , 4300
P: 07 3418 0500 F: 07 3418 0355
www.newhopecoal.com.au/home.aspx

NEW LENTON

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About: The final terms of reference regarding the proposed New Lenton coal mining project, located 120 kilometres south west of Mackay, in Central Queensland, has now been completed and an Environmental Impact Statement is currently being compiled by project owner New Hope.

New Lenton Project Managed by New Lenton Coal Pty Ltd

The New Lenton Project is being managed by New Lenton Coal Pty Ltd, a fully owned subsidiary of New Hope Corporation Limited. The company has already been granted lease approval to mine up to two million tonnes a year of ROM (run-of-mine) coal at the site. It had been proposed that mining on this part of the site would begin in 2016. Once all approvals are granted for the remaining leases, production at the New Lenton coal project would be increased to eight million tonnes annually. The obtaining of these remaining leases would allow New Hope's coal mining tenement holdings at the site to cover a total area of 4,895 hectares.

The New Lenton coal mining project is to be developed adjacent to the Issac River 20 kilometres south of the town of Glenden, 65 kilometres north west of Nebo and 65 kilometres north of Moranbah, in the Issac Municipality of Central Queensland.

New Lenton CHPP to Produce Five Million Tonnes of Coal a Year for 25 Years

It is proposed to mine the New Lenton open cut operation in the conventional manner by using truck and shovel methods. All coal mined at the site is to be processed in a new CHPP (coal handling and preparation plant) that will be expected to produce up to five million tonnes of coking and thermal coal for export annually, for the next 25 years.

Waste from the processing of raw coal in the CHPP will initially be disposed of by storing it in a disposal dam that will be especially built for that purpose. All such waste will eventually be stored in-pit once sufficient space has become available.

Stockpiled coal will be either trucked from the site to an off-site train load out facility or loaded directly into railway wagons on-site. Once the wagons are loaded the coal will be taken to either the Abbot Point or Dalrymple Bay coal export terminal to be exported to overseas customers.

On-site infrastructure required at the New Lenton Project will include to construction of haulage roads, amenity and administration buildings, equipment laydown areas, wash bays, a warehouse, maintenance workshop, fuel farm, waste rock emplacements, coal stockpile areas, potable and sewage water treatment plants, flood protection and water storage.

New Lenton Project to Employ 200 Construction Workers

The construction stage of the New Lenton coal mining project will take between one and two years to complete and create up to 200 jobs. Once operational the mine will employ about 300 people in a full time capacity.

The New Hope Group is an Australian owned energy company that has been operating is south east Queensland for over 60 years. In 2011 New Hope Group sold 10 percent of the New Lenton Project to a subsidiary of, Mai-Lao Power Corporation, Formosa Plastics Group.

New Hope Group

The New Hope Group is a Queensland based Australian owned and operated energy company with interests in coal mining, oil, exploration and port operations.Established in 1952 in Ipswich with coal operations and the purchasing of Tivoli Collieries, Southern Cross and Haighmoor Collieries in the...........read more

ADDRESS

New Hope Group
3 22 Magnolia Drive
Brookwater, QLD 4300

PO BOX 47
Ipswich, QLD 4305

OTHER INFO

Phone07 3418 0500
fax07 3418 0355

View New Hope Group Page

We Currently have No Jobs Specified for

NEW LENTON

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at New Lenton

Y Fronts teaser banner MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

iComplii