About: The Mulga Rock Uranium Project is located on the western end of the Great Victoria Desert, 240 kilometres east-north-east of Kalgoorlie, in Western Australia. It is in the process of being developed by Vimy Resources Limited, a resource development company based in Perth, that was prevously known as Energy Minerals Australia.

Plans Well Advanced for the Development of the Mulga Rock Uranium Project

Development of the Mulga Rock Uranium Project, to date, has involved the design of a processing plant, an airstrip, accommodation camp, access roads, tailings storage facilities and waste rock dumps. It is planned to operate the mine as an open cut operation extracting ore from four separate deposits, namely; Shogun, Emperor, Ambassador and Princess. It is expected to have a mine of life of around 12 years producing uranium oxide concentrate that would be shipped overseas from either the port of Adelaide or the port of Darwin. It is proposed to produce 1,300 tonnes of uranium oxide a year throughout its productive life.

Mulga Rock Uranium Deposits are Located in a Remote Region

The Mulga Rock shallow pit mining operations will all extract contained uranium from carbonaceous ore bodies. The processing of all mined ore will be undertaken at the one central on-site processing plant. The project area covers 90,190 hectares of unallocated crown land, consisting mainly of sand dunes, in one of the most remote regions of Australia. Access to the site at the present time is only posible by four wheel drive vehicles and the nearest populated area is at Laverton, which is 200 kilometres to its north west.The remote Pinjin Station Homestead is 100 kilometres to the project's west and the Coonana Aboriginal Community is located 130 kilometres to its south south west. The Tropicana gold mine is situated 110 kilometres north east of the Mulga Rock uranium deposits and the Kanandah Station Homestead is about 150 kilometres to its south east.

Mulga Rock Uranium to be Transported to the Port by Road Transport

It is planned to mine around 3.5 million tonnes of ore a year that will be crushed, beneficiated ( the separation of different minerals) and processed, with the use of an on site acid leach and precipitation plant. Other metal concentrates included in the mined ore will be recovered using sulphide precipitation after all the uranium has been removed. These metals will notbe radioactive and will be sold separately. Uranium produced at the Mulga Rock mine, when it becomes operational, will be placed in drums before being placed in sealed sea containers and taken to the chosen port by road transport where the sea containers will be loaded onto ships for delivery to overseas customers.

Infrastructure to be constructed at the Mulga Rock Project Site will include a diesel powered power plant with a capacity to produce up to 12 megawatts of electricity. The tapping of a saline water borefield and a mine reinjection borefield along with all the necessary pipelines, communication systems and a waste water treatment plant.

The Mulga Rock Uranium Project is expected to produce Uranium (78 percent), nickel (nine percent), cobalt (eight percent) and scandium (two percent).

Vimy Resources Limited

Vimy aims to become a reliable and respected uranium producer with its primary focus being the development of the Mulga Rock Uranium Project, located approximately 240km northeast of Kalgoorlie in Western Australia.Vimy Resources Limited is a resource development company based in Perth, that was...........read more

ADDRESS

Vimy Resources Limited
10 Richardson Street
West Perth, WA 6005

PO Box 23
West Perth, WA 6872

OTHER INFO

Phone0893892700

View Vimy Resources Limited Page

We Currently have No Jobs Specified for

MULGA ROCK

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Mulga Rock

Y Fronts teaser bannerDowner Group MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

Downer Group