About:

The CuestaCoal Moorlands coal mining project in Queensland's western Bowen Basin, is located 30 kilometres to the west of Clermont. The Moorlands project with a coal resource of 146.1 million tonnes and a strike length of around 13 kilometres, will have a life of mine of around 30 years with a production rate of about two million tonnes a year of run-of-mine (ROM) coal. It is a significant development situated 14 kilometres from existing mining infrastructure at the now closed Blair Athol coal mine.


Moorlands to Produce a high Volatile Bituminous Thermal Coal
The coal to be mined at the Moorlands open pit, when it comes on line, will be a high volatile bituminous thermal black coal that, when washed, has ash values within the range of 9 to 15 percent.


Moorlands Project Major Shareholder is Chinese Investment Company Beijing Guoli
CuestaCoal's major shareholder is Beijing Guoli, a Chinese state owned energy investment company. Beijing Guoli holds its interest in CuestaCoal through its wholly owned Australian subsidiary Longluck Investments (Australia) Pty Ltd. Beijing Guoli received approval from the Chinese government to invest in CuestaCoal on June 5, 2013 after CuestaCoal acquired the project from Hannigan and Associates, Orion Coal, in 2012.


Moorlands to be CuestaCoals First Open pit Coal Mine
The Moorlands project has become CuestaCoal's flagship development and once production starts in 2016 will be its first operating open pit coal mine in Australia since the company was formed.


Moorlands Project to Negotiate Infrastructure Usage

QuestaCoal is hoping to utilise existing infrastructure to get its product to the coast for exporting overseas as the Moorlands project is only 14 kilometres from the now unused infrastructure at the recently closed Rio Tinto owned Blair Athol mine. Coal mined at Blair Athol was loaded onto trains and transported the 280 kilometres by rail to the Dalrymple Bay Coal Terminal, from where it was loaded onto ships to be taken to overseas customers. The Moorlands project is also located 30 kilometres east of the proposed Hancock Coal Pty Ltd railway that, when constructed, will be taking coal from its Alpha Project to the Abbott Point port.


The Moorlands coal body will be mined by means of open pit method with low strip ratios. This will result in less capital required for the start up process. This, and the ability to negotiate use of existing infrastructure, will deliver obvious financial benefits that go a long way to making the operation feasible.


Coal Discovered in the Moorlands Basin in 1979
Coal was discovered in the Moorlands Basin by Pacific Coal in 1979. two separate holes identified the seam at a depth of 96 metres. In 1985 further exploration extended the resource with three main coal seams being identified, these being the; Kalbar-2, Kalbar-1 and Monteagle. In 1993- 1994 a comprehensive survey identified a 13 kilometre long and from one to two and a half kilometre wide highly prospective zone. Up to 13 coal seams have since been identified in the Moorlands Basin.
 

Cuesta Coal

Cuesta holds a current portfolio of 34 exploration coal permits or tenements located throughout Qld, of these 13 are in application stage. Locations include West owen, Surat, Clarence/Moreton and Galilee Basins. Cuesta's main project currently is Moorlands which is a large thermal coal, open cut...........read more

ADDRESS

Cuesta Coal
Level 15, 31 Market Street
Sydney, NSW 2000

OTHER INFO

Phone0292845900
fax0292845999

View Cuesta Coal Page

We Currently have No Jobs Specified for

MOORLANDS

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Moorlands

Y Fronts teaser banner MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....