National Pump and energy
HomeMinesWAMining Area C
171 COLLINS STREET MELBOURNE VIC , 3000
P: 1300 554 757 F: 03 9609 3015
www.bhpbilliton.com

MINING AREA C

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About: Mining Area C is a BHP Billiton open cut iron ore mine 92 kilometres from Newman in the Western Australia Pilbara region. It consists of 30 iron ore deposits and is one of seven other iron ore mines BHP Billiton operate in the same region. It is regarded as part of the Mount Goldsworthy Joint Venture that includes; BHP Billiton, Mitsui and Company Limited , Itochu Corporation and Iluka Resources. Iluka Resources interests being in the form of 'life-of-deposit' royalties owing on certain tenements resulting from the 1994 restructure of deferred payments owed to Consolidated Goldfields, an antecedent company of Iluka's, that originally had a one third interest in the Mount Goldsworthy venture.

Iron Ore From the Mining Area C Mine is Exported From Finucane Island Port Hedland

Ore taken from the Mining Area C open cut mine is processed by means of a primary crusher before being taken by conveyor to the concentrator that has a capacity to handle 45 million tonnes of iron ore each year. It is then taken by the company's Mount Newman Railway to its port facility at Port Hedland where it finally finishes up at the BHP Billiton export facility on Finucane Island. At the end of the 2009/2010 financial year the mine had a proven resource of 650 million tonnes at a grade of almost 62 percent and over two and a half billion tonnes graded at just over 60 percent.

Mine to be 100 Percent Owner Operated
BHP Billiton has a goal of becoming a 100 percent owner operator of its iron ore mining operation at Mining Area C and to this end acquired Leighton Holdings' HWE Mining Subsidiaries in September, 2011. HWE Mining Subsidiaries had, at that time, been providing contract mining equipment and like assets to Mining Area C and the nearby Yandi mine.

The Mining Area C iron ore mine activities include drilling, blasting, loading, hauling, processing, train loading, maintenance and infrastructure management. The mine is managed on the basis of 24 hours a day, 365 days of the year operation. There are 650 employees at the BHP Billiton Pilbara mines who processed over 45 million tonnes in 2011.

Workers Looked After With Modern Amenities
Workers at the Mining Area C mine live in the mining site village when on roster . They are flown into work and flown out again when their shift is finished. While at the mine they have full use of all facilities that include a well equipped gymnasium, wet mess, shop, indoor cricket, volley ball, tennis and a walking and running track. Food supplied is of a high standard.

A Close Relationship with Indigenous Landowners

Mining Area C has a close relationship with the indigenous land owners of the area, the Martu Idja Banyjima and Innawonga Bunjima Niapaili people. Native Title agreements with these two peoples guarantees the traditional owners will share in the benefits that are derived from the operation. This was particularly obvious during the mine construction period when five percent of the contract workforce were indigenous. The company has a goal of raising this percentage to 12 percent.

The annual capacity of the company's iron ore production from the Pilbara region was 178 million tonnes at the end of 2011 and with the development of another deposit, the Orebody 24 mine, this figure will again be exceeded. This new development is expected to increase production by a further 17 million tonnes a year, bringing the company's total Australian iron ore production to 350 million tonnes a year.

BHP Billiton

BHP Billiton have been in the industry for over 150 years & are among the largest producers of major commodities such as aluminium, copper, coal, iron ore, silver & branching out into oil & gas.They have over 100 locations throughout the world & employ more than 100,000 employees &...........read more

ADDRESS

BHP Billiton
171 Collins Street
Melbourne, VIC 3000

OTHER INFO

Phone13 0055 4757
fax03 9609 3015

View BHP Billiton Page

We Currently have No Jobs Specified for

MINING AREA C

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Mining Area C

Y Fronts teaser banneriComplii MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....