National Pump and energy
HomeMinesWAMcleay
LEVEL 5, 85 SOUTH PERTH ESP SOUTH PERTH WA , 6151
P: 08 9238 8300 F: 08 9238 8399
contact@igo.com.au
www.igo.com.au

MCLEAY

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The Independence Group (IGO) was formally incorporated in 2000 as an exploration company searching for world class ore bodies within Australia. In 2001 it explored and pegged out an area that contains the world rated Tropicana gold project that is of such standing it is already being spoken about in the industry as a new Western Australian gold province. In 2002 AngloGold Ashanti became part of IGO.


The McLeay Gold Bearing ore Deposit is Part of the Long Nickel Mine
IGO acquired the Long Nickel Mine in the Eastern Goldfields of Western Australia, near the mining town of Kambalda, in 2002, through its fully owned subsidiary Lightening Nickel, from WMC Resources. The McLeay gold deposit is part of Long Nickel Mine. This was the company's first venture into nickel mining and it paid dividends as it has proven to be a reliable cash flow for the company ever since. The Long Nickel Mine was commissioned in October 2002 and the McLeay ore body discovered in 2005, this allowed the Long Mine to build a reserve base that would extend the life of the Long Nickel mine to at least 2017 if the production rate was retained at 9,000 tonnes of contained nickel a year.


McLeay Deposit Still Producing Gold
The McLeay gold bearing ore body is still being worked at the Long Nickel Mine. It consists of a swarm of porphyry dykes stopes at the southern extension of the existing orebody. A fact that creates considerable difficulty for drilling to be carried out. This has created a problem when seeking to undertake reliable testing in an effort to determine the prospective nature of the deposit stretches any further to the south. To overcome this problem it was decided to use the McLeay decline to extend the drilling beyond the porphyry swarm in order to test if the McLeay ore body extended further.


IGO Have Toll Agreement With BHP-Billiton Nickel West Pty Ltd to Take Long Nickel Mine ore
IGO have a toll agreement with BHP-Billiton Nickel West Pty Ltd to take all the gold bearing ore produced at the Long Nickel Mine, including that from the McLeay deposit, and process it through its Nickel West Kambalda Nickel Operations Concentrator, to produce nickel concentrate. BHP purchase the concentrate that is recovered according to the terms of the contract. This agreement is to continue until February 2019.


McLeay Deposit is Mined with Hand Held Mining Equipment
Mining methods used to recover gold from the McLeay deposit range from mechanised jumbo flatback stoping to hand held mining equipment that is primarily used when working narrow stopes that are not suitable for machines. Other areas of the Long Nickel Mine make use of long hole open stoping with either paste or mullock backfill. When necessary non- entry mechanised mining methods are utilised for safety reasons. Stoping sub-level spacing is designed to minimise geotechnical and dilution risk.


Two Lava Channels Make up the Long Nickel Mine Mineralisation
There are two distinct lava channels that are incorporated in the Long Nickel Mine tenure, these being; (1) the lower nickel channel that includes the Moran and Long orebodies and (2) the upper nickel channel that includes the McLeay, Victor South, Victor, Gibb South and Gibb orebodies.


Before IGO acquired the Long Nickel Mine tenements from WMC, it had become WMC's longest operating nickel mine, having been in existance for the previous 21 years. The mine has the second largest concentration of
nickel throughout the whole Kambalda nickel region.
 

Independence Group

Independence Group was incorporated in 2000, in 2002 the company acquired the Long Nickel mine in Kambalda and entered into nickel producing.A joint venture with AngloGold Ashanti on the Tropicana Gold Project has proven feasible.in 2011 the company completed a takeover of Jabiru Metals Ltd, giving...........read more

ADDRESS

Independence Group
Level 5, 85 South Perth Esp
South Perth, WA 6151

P.O. Box 496
South Perth, WA 6951

OTHER INFO

Phone0892388300
fax0892388399

View Independence Group Page

We Currently have No Jobs Specified for

MCLEAY

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Mcleay

Y Fronts teaser bannerDowner Group MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

iComplii