doing fifo financially smart
HomeMinesVICMaddingley
EAST MADDINGLEY RD BACCHUS MARSH VIC , 3340
P: 03 5367 3211
maddingleybrowncoal.com.au

MADDINGLEY

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The Maddingley brown coal mine in Melbourne's western suburb of Bacchus Marsh, consists of a brown coal formation known as leonardite, a soft, waxy, shiny brown coal that is soluble in alkaline solutions. It contains around 90 percent of humic and fulvic acid, a feature that makes it useful as a soil conditioner, a stabiliser in water treatment programs and capable of lowering certain polluted environments. The brown coal deposit at the Maddingley Mine has been estimated to contain 400 million tonnes of leonardite, the largest of only three other like deposits in the world. The other two being in Mexico and Germany.


Brown Coal Mining Began at the Maddingley Mine in the 1940's
The Maddingley deposit of brown coal was first surveyed in the 1930's and mined during the 1940's when it was transported by rail to the Australian Paper Manufacturers siding at Fairfield, another of Melbourne's western suburbs. During this time the Australian Paper Mill used an average of 400 tonnes of Maddingley coal a day, that was delivered by two train loads a week, for firing its boilers. This market ceased in the 1970's when the paper mill converted to natural gas firing. Maddingley Coal was used between the 1970's and 1980's to fuel boilers at the CRA/Visey cardboard manufacturing plant near the Rowsley Railway Station. However, this factory closed its operations in 1990 and the mine was purchased by the Calleja Group for the dumping of green waste. Four years later, in 1994, the Calleja Group, introduced a technology that created a product known as densified coal. A coal that has its moisture removed and made equal to black coal. It also invested in marketing the coal as a soil conditioner and fertiliser that could replace super phosphate. In 1997 the technology used to successfully produce densified coal was officially recognised as the Coldry Process.


Maddingley Coal Drying Plant Established at JBD Industrial Park
The Maddingley coal drying plant has been established on land that formerly housed the CSR hardboard mill. It is known today as the Calleja Group's JBD Industrial Park. Their tenants at the park include a fertiliser and soil manufacturing plant, a sand producer and an oil manufacturer.
The former Maddingley open cut coal mine that once produced coal for the APM factory became used landfill and a storage site for residual waste resulting from paper recycling.


Landfill Created Leachate at the Maddingley Mine has Been Turned Into Clean Treated Water
As all landfill operations create a substance called leachate, a liquid that contains high levels of substances that are considered harmful to the environment, Maddingley Brown Coal Pty Ltd began on a program to find a waste water solution. The company now supplies clean treated water suitable for irrigation.


The Maddingly brown coal mine was originally purchased by the Calleja Group for its 13.5 million cubic metre hole for use as a landfill site. Although this has continued and the hole is now almost full the remaining coal still continues to be used as a densified coal product and a soil conditioner.

Calleja Group

In 1950 the Calleja family settled in Melbourne Vic, making their way from Malta. From humble beginnings of purchasing one truck and working as a sub contractor carting scrap metal. Today in its third generation of Calleja's their core business continues to be the collection of recycling and...........read more

ADDRESS

Calleja Group
East Maddingley Rd
Bacchus Marsh, VIC 3340

OTHER INFO

Phone0353673211

View Calleja Group Page

We Currently have No Jobs Specified for

MADDINGLEY

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Maddingley

Y Fronts teaser banner MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

iComplii