doing fifo financially smart
HomeMinesSALake Macdonnell
1 INNES AVENUE THEVENARD SA , 5690
P: 08 8625 3750 F: 08 8625 3147
www.boral.com.au

LAKE MACDONNELL

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About: The mining of gypsum first started at the Lake Macdonnel mine in 1919 and by 2002 it was producing over one million tonnes of gypsum a year. Gypsum Resources Australia (GRA), a company jointly owned by Boral and CSR, have owned the mine since 1984. The mine, which is situated between Penong and Ceduna in Western South Australia, is situated within the biggest deposit of gypsum anywhere south of the equator. It has been estimated the gypsum deposit at Lake Macdonnel to be between 500 and 700 million tonnes, covering an area of 87 square kilometres. The current production from the mine being just over one million tonnes annually.

Gypsum Taken From Lake Macdonnel to Sydney
The gypsum at the Lake Macdonnel mine comes from a deposit of gypsarenite containing 93 percent gypsum calcium suphpate. This deposit lies above five metres of selenite that contains between 94 and 96 percent gypsum calcium sulphate. The gypsum recovered from the strip mining of the deposit is bulldozed into long windrows where it's kept for several years to allow the natural rainfall to leach out the salt content. When free of salt the gypsum is railed 64 kilometres from the mine site to a small port at Thevenard for loading, by conveyor, onto ships for transportation to large storage bins at Glebe Island in Sydney, from where it is distributed to the company's various customers within Australia, New Zealand and the Pacific.

Mining at Lake Macdonnel a Simple Matter

Mining at the Lake Macdonnel gypsum mine follows the simple process of raising the easy deposits with bulldozers. Excavators are used to dig out the rock like deposits. Front end loaders, semi-tippers and triple road trains are used within the mine site itself because of its vastness. The salt free gypsum is finally railed to the port stockpile of some 160,000 tonne to await loading onto ships.

Gypsum mined at Lake Macdonnel accounts for nearly all of Australia's gypsum production and it satisfies the Australian market requirement of gypsum in the production of cement, plasterboard and for use in agriculture. It is taken from the South Australian port of Thevenard by the company's own ships, Orninston and Kowulka and various charter vessels. The mine creates about 40 jobs for local people, mainly living in Ceduna.

Three trains a day, each one carrying 1,850 tonnes of gypsum, operate every day of the week between the Lake Macdonnel mine and the port at Thevenard where the ships are loaded at a rate of 970 tonnes an hour. As the port restricts ships to carrying no more that 20 thousand tonnes of gypsum each, shipping from the port entails the use of between 75 and 80 ship visits every year.

Modernisation Plans for More Efficient Future
GRA are to place a new crushing plant at the mine as well as replacing mobile and extraction equipment. They are also looking at replacing the current ships and maximising the lift at the port in an effort to increase the average shipping out of the port facility to either 29 or 34 thousand tonnes per ship to increase the mine's ongoing viability.

Gypsum Resources

USG Boral is a 50% shareholder in Gypsum Resources Australia (GRA) which owns and operates one of Australia’s largest economic natural gypsum resources. In early 2014, Boral’s Gypsum came together with USG to form a 50/50 joint venture known as USG Boral. With close to 3,500 employees, USG...........read more

ADDRESS

Gypsum Resources
1 Innes Avenue
Thevenard, SA 5690

OTHER INFO

Phone08 8625 3750
fax08 8625 3147

View Gypsum Resources Page

We Currently have No Jobs Specified for

LAKE MACDONNELL

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Lake Macdonnell

Y Fronts teaser bannerDowner Group MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

iComplii