HomeMinesWAKeysbrook
LEVEL 2, 100 ROYAL STREET EAST PERTH WA , 6004
P: 08 9328 9800 F: 08 9328 9911
admin@mzi.com.au
mzi.com.au

KEYSBROOK

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About: The Keysbrook Mineral Sands Project is based on mining a major leucoxene deposit situated 70 kilometres south of Perth, near the towns of North Dandalup and Keysbrook, in Western Australia. When it becomes productive, in late 2015, it will be one of the world's largest leucoxene mining operations.

Keysbrook Project Being Developed by MZI Resources

The Keysbrook mineral sands project is being developed by MZI Resources ( Matilda Zircon Resources) through its wholly owned subsidiary Keysbrook Leucoxene Pty Ltd (KLPL). The sand mine will be primarily focused on producing zircon, rutile and leucoxene heavy minerals for the Chinese and the USA markets.

Keysbrook Heavy Minerals Concentrate to be Processed at Doral's Picton Plant

The Keysbrook mineral sands project involves the development of an open pit sand mine and a primary processing facility. The heavy mineral concentrate recovered from the Keysbrook mineral sands project will be taken by road transport, via the South West Highway, to the Doral mineral sands separation plant at Picton, 120 kilometres to the south, where it will be separated into leucoxene and zircon concentrate in readiness for export through the port at Bunbury. The project is expected to produce around 96,000 tonnes of heavy mineral sands a year comprising, 29,000 tonnes a year of zircon concentrate, 38,400 tonnes a year of L88 (88 percent titanium dioxide) and 28,800 tonnes a year of L70 (70 percent titanium dioxide) and 11 percent other minerals.

Keysbrook Deposit Covers an Area of 1,406 Hectares

It is planned to mine 4.5 million tonnes of ore a year at the Keysbrook project to an average depth of about 2.2 metres, making it a very low cost mining operation. The land surrounding the project area is mainly pastoral and raises both beef and dairy cattle. It also consists of some areas that have suffered from the degrading of native vegetation. The heavy mineral ore deposit at Keysbrook is dunal, it has no overburden and very little clay or rock content. The deposit covers an area of 1,406 hectares in total with the mineral leucoxene its main constituent.

GR Engineering Services win Contract to Construct Keysbrook Project

MZI Resources have appointed GR Engineering Services to carry out the construction of the Keysbrook mineral sands project. The first work undertaken has been the construction of an access road, this is to be followed with the undertaking of earthworks at the project site. The heavy minerals concentrator is also to be constructed on site along with all the other mining infrastructure requirements. It is expected that production will commence during the December quarter of 2015.

GR Engineering Services have also commenced work at the Doral Mineral Sands Pty Ltd owned Picton mineral separation plant, in the carrying out of the necessary expansion and upgrading work, that is needed to accommodate the extra throughput that will be occasioned from the additional Keysbrook production when it starts up later in the year.

Once production commences the Keysbrook mineral sands project will be a seven day a week 24 hour a day mining operation. It will use an excavator and articulated dump trucks at the mine site.

MZI Resources

MZI Resources is a mineral sands company mainly focused on the high value minerals of:Zircon, Rutile and Leucoxene. MZI is focused on two projects in: - Tiwi Islands, Northern Territory, is now complete and no further mining will be produced. The mine has been placed on care and maintenance,...........read more

ADDRESS

MZI Resources
Level 2, 100 Royal Street
East Perth, WA 6004

PO Box 3011
East Perth, WA 6892

OTHER INFO

Phone08 9328 9800
fax08 9328 9911

View MZI Resources Page

We Currently have No Jobs Specified for

KEYSBROOK

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Keysbrook

Y Fronts teaser banneriComplii MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....