About:

Karara is a substantial magnetite ore body of world class significance in both quality and size. It also has a very low waste-to-ore stripping ratio that will be able to produce around 30 million tonnes of ore a year for more than 30 years.

Ansteel Purchases all the Karara Mine Production for the Life of the Mine

 

The company, Karara Mining Limited, was established in 2007 by a joint venture agreement between Gindalbie Metals Limited and Anshan Iron and Steel Group Corporation (Ansteel), one of the biggest steel makers in China and China's largest iron ore miner. Ansteel has also arranged an offtake arrangement with Karara Mining to purchase all its iron ore production for the life of the mine.

Karara Mine is 200 Kilometres from Geraldton

The Karara mine is located 200 kilometres east of Geraldton in Western Australia's mid-west region. The project has required the construction and operation of a large open pit mine and all associated infrastructure, including a processing plant to produce magnetite concentrate.

First Karara Mine Magnetite Concentrate Shipment Left for China in 2013

The Karara mine has a JORC Resource of 2.409 billion tonnes grading at 34.1 percent iron and around one billion tonnes grading at 68.2 percent iron. It also has a JORC Reserve of 955.5 million tonnes grading at 36.4 percent iron. The Karara project incorporates many direct shipping ore (DSO) hematite ore bodies. The first hematite ore was exported from the port at Geraldton in March 2011, however, it was not until January 2013 before the first 55,000 tonnes of magnetite concentrate was shipped to China.

Karara Mine Accommodation Village has Modern Quality Facilities

There were more than 1,500 workers employed during the construction stage of the Karara mine and around 500 permanent employees now working at the mine during its production stage. There are also an additional 300 indirect employees such as contractors etc. Workers at the mine are housed in the mine's accommodation village when rostered on as it is a fly-in-fly-out mining operation. The flight from Perth takes only 45 minutes, about an hour from Bunbury and just 30 minutes from Geraldton. The accommodation village has modern first class facilities that include; vollyball, gymnasium, cricket ground, tennis courts, mini golf course, swimming pool, internet and 3G mobile coverage.

Karara Mine Becomes an Industry Leader in Downstreaming Magnetite ore to Premium Grade Concentrate

The importance of the Karara mine development is that it takes a low grade magnetite iron ore and from it produces a high grade premium concentrate that is used in steel making. It realises the long held belief that the Australian iron ore industry is able to establish downstream processing that value adds its product. The Karara mine is a leader in the unlocking of extensive deposits of low grade magnetite ore that exists in the Mid-West region of Western Australia and processing it into a high grade, quality magnetite concentrate that is highly sought after in China. The eight million tonnes a year capacity concentrator is the heart of the Karara project. Without it the mine would have little value.

The Karara mine is the second largest magnetite project in Australia with production ramping up to its target of eight million tonne of high grade quality magnetite concentrate grading at 68 percent iron a year. The project's DSO hematite production is running at around two million tonnes a year.


Karara Mining Limited

Established in 2007 through a joint venture between Anshan Iron and Steel Group Corporation (52.16%) and Gindalbie Metals Limited (47.84%) for the development of the world-class Karara Project.Karara produces both high grade magnetite concentrate and Direct Shipping Ore hematite. Karara made its...........read more

ADDRESS

Karara Mining Limited
Level 9, 216 St Georges Terrace
Perth, WA 6000

OTHER INFO

Phone0862981888
fax0862981099

View Karara Mining Limited Page

Operations Supervisor

Bis Industries is seeking an experienced Operations Supervisor to join our operations at Karara.

  • State: WA
  • Commute: FiFo
  • roster: 8:6
  • Site: karara-project

Brierty has a contract role at karara-project

Established since 1981, Brierty specialises in civil construction and mining. Over the last 10 years Brierty has established themselves as a mining contractor capable of supplying services such as;Bulk overburden strippingDrill and BlastTrain loadingTailings and water storage facilitiesVegetation ...Read More

ADDRESS

Brierty
Level 2, 72 Melville Parade
South Perth, WA 6951

Level 2, 72 Melville Parade
South Perth, WA 6951

OTHER INFO

Phone08 9267 8000
fax13 0073 5152

More info about Brierty

Following are the resources mined at Karara Project

Y Fronts teaser banner MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....