National Pump and energy
HomeMinesWAKarara
LEVEL 9, 216 ST GEORGES TERRACE PERTH WA , 6000
P: 08 6298 1888 F: 08 6298 1099
www.kararamining.com.au

KARARA

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The Karara Magnetite iron ore mine is located about 200 kilometres east of Geraldton, within the Shire of Perenjori, in the Mid West region of Western Australia. The mine, which is a Joint Venture between Ansteel, a Chinese steel producer with a 52 percent shareholding and Gindalbie Metals, that has a 48 percent shareholding, is managed by Karara Mining Limited.


Karara Mine is the Largest Iron ore Mine in Mid West Western Australia

The long life, Karara open cut iron ore mining project, which is the largest iron ore mine in the Mid West of Western Australia, is capable of producing more than 30 million tonnes of magnetite a year, alongside a smaller hematite operation.


Karara Mine is a World Class Iron ore Mine

The Karara project is a world class mining operation because of its extremely low waste, consistency, quality and scale, that enjoys a relative low running cost because of its favourable ore stripping ratio. The operation mines low grade magnetite iron ore that produces a high grade quality concentrate that is sought after by steel mills in Asia. The project includes its own infrastructure base and a major processing plant.


Karara Mine Exports First Magnetite Shipment in 2013

The first hematite ore shipment from the Karara mining operation took place in March, 2011, with the first magnetite shipment leaving the mine in early January, 2013. The magnetite shipment was of particular significance in that it was the first commercial shipment of magnetite concentrate to leave the Mid West region, as most of the iron ore shipped out of Australia prior to this shipment had been hematite ore.


Karara Magnetite ore has Lower Iron Content than Does its Hematite ore.

Magnetite ore has a lower iron content to that of hematite ore and is found to be particularly suitable in the manufacturing of iron ore pellets, that are used in the production of steel. The first magnetite ore exported out of the Geraldton port totaled 57,000 tonnes that was shipped to China.


Ansteel Pulls out of Joint Venture Partnership With Gindalbie Metals in Running the Karara Project

In early 2016, the Karara mine was involved in a financial crisis that came about because of the continuing low global price for iron ore eating into its profitability, when the Joint Venture partner, Ansteel, announced it would no longer fund the project. This decision, made by Ansteel, cast doubts on whether Gindalbie could continue to operate the project without the financial support of a major partner.


Costs may Force Karara Mine Into Care and Maintenance

It is feared that unless Gindalbie Metals can find a way to lower its operational costs even further, it may be forced to place the mine into care and maintenance for a period, until prices improve. The Karara mine employs around 1,000 mine workers. The Karara mine was forced to reduce its workforce by 15 percent in March, 2015, because of market conditions at the time, which included the falling iron ore price.

Karara Mining Limited

Established in 2007 through a joint venture between Anshan Iron and Steel Group Corporation (52.16%) and Gindalbie Metals Limited (47.84%) for the development of the world-class Karara Project.Karara produces both high grade magnetite concentrate and Direct Shipping Ore hematite. Karara made its...........read more

ADDRESS

Karara Mining Limited
Level 9, 216 St Georges Terrace
Perth, WA 6000

OTHER INFO

Phone0862981888
fax0862981099

View Karara Mining Limited Page

Electrician

Bis Industries is seeking an Electrical Maintainer / Operator to join its operations at Karara.

  • State: WA
  • Commute: FiFo
  • roster: 14:7
  • Site: Karara

Mechanical Maintainer Operator

Bis Industries is seeking a Mechanical Maintainer / Operator to join its operations at Karara.

  • State: WA
  • Commute: FiFo
  • roster: 14:7
  • Site: Karara

No Information listed at this time ......

Following are the resources mined at Karara

Y Fronts teaser banneriComplii MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

iComplii