doing fifo financially smart
HomeMinesQLDJellinbah East
LEVEL 7, 12 CREEK STREET BRISBANE QLD , 4000
P: 07 3877 6700 F: 07 3221 7119
www.jellinbah.com.au

JELLINBAH EAST

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The Jellinbah East black coal open pit mine in the Bowen Basin Region of Queensland, that is located on the Tropic of Capricorn near the town of Bluff, transports its coal production of 4.6 million tonnes a year, 300 kilometres by rail, to the Gladstone port for exporting overseas.


The Jellinbah East Mine Began Production in 1989
The Jellinbah East Mine has been producing coal since 1989 at its open cut
operations that is carried out in the conventional manner by means of overburden drilling and blasting to loosen it sufficiently so it can be removed by shovel and truck and dozer push.


Jellinbah Coal is Ideally Suited to Pulverised Coal Injection Usage
Coal mined at Jellinbah East is a low volatile bituminous black coal that has a low ash and sulphur content combined with high specific energy. Coal with these properties is ideally suited to PCI (pulverised coal injection) and super soft coking coal that is blended for the purposes of making coke. The Jellinbah Group have a 70 percent interest in the mining operation, the other two partners in the venture being Marubeni Coal and Sojitz Coal that hold 15 percent each.


Two Pits Currently Make up the Jellinbah Coal Mining Operation
The two pits in operation at the Jellinbah East mine at the present time is, Jellinbah Central, that is both owned and operated by the joint venture partners and, Plains Pit, that although owned by the joint venture partners, is operated by mining contractor John Holland. The thickness of the coal seam at both pits and the favourable strip ratio makes the Jellinbah mine highly productive.


Eighty Percent of Jellinbah Coal is Impurity Free
Coal mined at the Jellinbah operation is subjected to crushing and screening in a plant capable of handling 1,200 tonnes of coal an hour. Quality sampling is taken during the crushing and screening process to determine the products ash content. After the coal leaves the crushing and screening process it is then either taken to the coal preparation plant, or left in a crushed coal stockpile. Eighty percent of the coal mined has very few, if any, impurities, this means it can be selectively mined and sold without being processed in readiness to become PCI quality coal. The remaining 20 percent has a higher ash content and requires washing in the processing plant before it is blended with the unprocessed coal. The coal is then taken by truck 25 kilometres to a railway siding. From here it is loaded onto coal trains, that can haul 7,500 tonnes at a time, for transportation to the Gladstone port.


Jellinbah East Coal Mine Carefully Reshaped and Rehabilitated
After an area has been mined it is carefully reshaped and rehabilitated. Top soil is spread over the reclaimed area and it is then seeded in compliance with Queensland Government environmental requirements.


The Jellinbah coal deposit stretches over a distance of 30 kilometres. The main coal seam being mined is the Pollux seam that averages eight metres in thickness. This coal seam dips slightly to the east and splits into two other seams, the Pollux Upper and the Pollux Lower seams. Coal reserves to the eastern boundary of the mining lease, that includes the Pollux seam, exceed 350 million tonnes. Other coal seams within the lease holding exceed 50 million tonnes.
 

Jellinbah Group

Established in 1988, Jellinbah is a privately owned independent group based in Qld and operating in the Bowen Basin. Jellinbah has 2 current projects underway, Jellinbah Mine and Lake Vermont, both producing hard and semi-soft coking coal.

ADDRESS

Jellinbah Group
Level 7, 12 Creek Street
Brisbane, QLD 4000

GPO Box 374
Brisbane, QLD 4001

OTHER INFO

Phone0738776700
fax0732217119

View Jellinbah Group Page

We Currently have No Jobs Specified for

JELLINBAH EAST

Visit Jobs Section

John Holland has a contract role at jellinbah-east

Dating back to 1949 John Holland has played a major part in the construction of some of Australia's most iconic landmarks, including Parliament House in Canberra and the Sydney Entertainment Centre in the 1970's.John Holland's largest project was the $2.5 billion East Link joint venture with Thiess ...Read More

ADDRESS

John Holland
70 Trenerry Cres
Abbotsford, VIC 3067

OTHER INFO

Phone03 9934 5209
fax03 9934 5275

More info about John Holland

Following are the resources mined at Jellinbah East

Y Fronts teaser bannerDowner Group MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....