doing fifo financially smart
HomeMinesNSWIvanhoe North
1 MARKET STREET, LEVEL 18, BT TOWER SYDNEY NSW , 2000
P: 02 9266 2700 F: 02 9261 5533
info@centennialcoal.com.au
www.centennialcoal.com.au

IVANHOE NORTH

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About: The Ivanhoe North coal mine, owned by Centennial Coal, had only been operating since 2010. It was mainly involved in cleaning up the coal left over at the old abandoned Cullen Main West Mine, 22 kilometres from the city of Lithgow. Since ceasing production in 2012 the area is now being rehabilitated by the mine owner.


The Ivanhoe North coal mine, when working, between 2010 and 2012, carried out limited open cut mining operations removing thermal coal from the Lithgow and Lidsdale coal seams, while at the same time carrying out rehabilitation work at the abandoned Cullen Main West Mine. The Cullen Main West was an open pit and underground coal mine that began operations after the Second World War finished in the 1940's but closed again in the early 1950's. It was later reopened by the Ivanhoe Colliery when it undertook mining of the seams by the old bord and pillar method. The bord and pillar technique of mining, sometimes referred to as room and pillar, was commonly used before longwall mining was introduced in the 1960's. It is achieved by using a grid of mine tunnels and continually cutting panels into the seam while leaving behind pillars of coal to support the roof. Some mines still use this method today, although it is becoming progressively outdated as new, improved techniques are introduced.

When Centennial Coal took on mining at Ivanhoe North in 2010 it had the job of extracting around 550,000 tonnes of coal left behind at the old mine site. It did this by truck and shovel and actually achieved a production level of 610,000 tonnes over three years. The coal was crushed at the mine site before being transported by truck to the either the Wallerawang or Mt Piper power stations, the Lidsdale railway siding, or the Western Main Colliery. As mining was taking place the company was also getting on with the job of rehabilitating the abandoned pit floor as well as the progressive open cut area it was working in.

In its last full year of production, 2011, the mine produced 0.18 million tonnes and all portable buildings and the crusher plant have now been removed. Rehabilitation work at the site included back-filling the open cut, contouring of the land, spreading top soil, seeding with native plants and fertilising. Considerable drainage work also had to be undertaken. The rehabilitation will undergo close monitoring until all parties are satisfied the area has been returned to match the natural surroundings.

Centennial Coal

From Humble beginnings in 1989, by 1994 Centennial Coal was listed on the Australian Stock Exchange and was in the top S+P/ASX 100 company. Making their mark on the thermal and coking coal domestic and export markets.In September 2010, Banpu Public Company took over and today Centennial is a wholly...........read more

ADDRESS

Centennial Coal
1 Market Street, Level 18, BT Tower
Sydney, NSW 2000

OTHER INFO

Phone02 9266 2700
fax02 9261 5533

View Centennial Coal Page

We Currently have No Jobs Specified for

IVANHOE NORTH

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Ivanhoe North

Y Fronts teaser banner MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

Downer Group