doing fifo financially smart
HomeMinesNZHuntly East
15 SHOW PLACE ADDINGTON CHRISTCHURCH NZ , 8024
P: 033 4560 F: 033 4560
info@solidenergy.co.nz
www.solidenergy.co.nz

HUNTLY EAST

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The Huntly East underground coal mine in New Zealand has been producing a high energy, sub-bituminous, low sulphur and low ash coal since 1978. Its two productive coal seams are from eight to 20 metres thick and lie at a depth of from 400 to 150 metres. The mine produces around 450,000 tonnes of coal a year with most of it purchased by New Zealand Steel for use at its nearby Glenbrook steel mill, however, Huntly East coal is also found to be suitable for a wide range of other uses, primarily electricity production and general undustrial use.

Huntly East Mine Entry is Under the Waikato River
The Huntly East coal mine is located north of the Huntly township in New Zealand and around 100 kilometres south of Auckland. It is entered where its surface infrastructure is established on the eastern side of the Waikato River. Underground roadways, constructed at a depth of 150 metres below the river, lead to the mine itself that is situated on the western side of the Waikato River. The coal that has been mined is loaded onto a railway at the mine that connects to the main trunk line nearby.

It has been estimated that there is around seven million tonnes of recoverable coal available at the Huntly East coal mine in areas that have already been approved for mining. There is also a further 12 million tonnes available nearby that can be accessed for expansion at a later date.

Coal Mined at the Huntly East Mine With use of Remote Controlled Continuous Miners
Coal is mined at the Huntly East underground mine with the assistance of large remote controlled and electric powered continuous miners. These giant machines load the extracted coal onto shuttle cars that take it to conveyor belts which take it to the surface. On the surface the coal is first sized and screened before being loaded into bins that take it to where it is distributed from road and rail loadout areas depending on its destination.

Most Huntly East Coal Used at Glenbrook Steel Mill
The vast majority of Huntly East coal, about 95 percent, is taken directly by rail to the Glenbrook steel mill. Steel is made at the Glenbrook mill from iron that is produced in the mill's blast furnaces that use coal and coke as a reducing agent as well as an energy source. Huntly East coal is also sold to horticultural suppliers in the North Island, light industrial companies, timber processing businesses, meatworks and lime manufacturers.

Huntly East Coal Mine Owned by Solid Energy
The Huntly East underground coal mine is owned and operated by Solid Energy New Zealand Limited, the largest coal mining company in New Zealand. Solid Energy is a state owned mining company that was formed in 1987 from the then government department owned, State Coal Mines. Solid Energy New Zealand Limited produces a total of around four million tonnes of coal a year from all its coal mines with 70 percent of its production used in the making of steel.


Approximately 200 people are employed at the Huntly East coal mine by Solid Energy New Zealand Limited. The company offers valuable work experience for young people who reside in the area as well as providing many apprenticeships. Additional employment opportunities are made available through contractors employed by the mine along with transportation and coal haulage opportunities.
 

Solid Energy New Zealand Ltd

From mines in Waikato, the West Coast of the South Island and Southland, Solid Energy export coal around the world and supply industrial users throughout New Zealand.The company’s coal production is around 4 million tonnes annually, which is evenly split between metallurgical coals for export and...........read more

ADDRESS

Solid Energy New Zealand Ltd
15 Show Place Addington
Christchurch, NZ 8024

PO Box 1303
Christchurch, NZ 8013

OTHER INFO

Phone033456000
fax033456016

View Solid Energy New Zealand Ltd Page

We Currently have No Jobs Specified for

HUNTLY EAST

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Huntly East

Y Fronts teaser bannerDowner Group MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

iComplii