About: The massive iron ore project being carried out at the Hope Downs mine in the Pilbara region of Western Australia is the result of exploration undertaken by Hancock Prospecting in 1992. To fully develop the project Hancock Prospecting formed a 50/50 joint partnership with Rio Tinto in 2005 and by November 2007 first production was achieved. Hope Downs is operated as a series of open pit mines exploiting the great Marra Marra iron ore deposit.

Hope Downs has its own Railway to the Port at Dampier
The Hope Downs open cut has a capacity to mine 30 million tonnes of iron ore a year. All of it being processed on site before being railed to the coast for shipping overseas. The Hope Downs ore is taken along a 30 kilometre spur line before it connects with Rio Tinto's own railway system servicing its other Pilbara iron ore mines. This line is known as the Hamersley and Robe River Railway. The spur line is known as the Lang Hancock Railway in honour of the founder of Hancock Prospecting, Lang Hancock.

Mine Site and Port Expansion Increases Output
The Hope Downs open cut iron ore mine is in the process of even further expansion at a cost of close to two billion dollars. The expansion will expand the Hope Downs 4 project and add another 15 million tonnes a year to the company's total iron ore production. It has also invested $US230 million on expanding the Dampier Port. This expansion has increased port capacity by another five million tonnes a year bringing its total capacity to 230 million tonnes annually. This investment is additional to the $US91 million spent on the port's expansion in 2010. that increased capacity then by five million tonnes a year to 225 million tonnes.

Financing Such a Large Project Proved Problematic
Hope Downs Iron Ore secured tenements over the ore body at the open cut site in 1992. In 1998 it secured the financial support of of Iscor, a South African company. Iscor eventually pulled out of the deal and a smaller player Kumba took on a partnership deal. Delays were caused when Kumba was taken over by Anglo, particularly when it became clear that Anglo had commitments with the South African Government that meant its main focus had to be with iron ore projects in South Africa.

Hancock Prospecting Finally Sealed the Deal With Rio Tinto
Things got moving when Kumba was replaced by Rio Tinto Iron Ore on July 1, 2005. Rio Tinto entered into a joint venture agreement with Hancock Prospecting on a 50/50 basis. As a result first production from the mine occurred in November 2007, after a set up cost of $1.3 billion, when the first train full of iron ore traveled the Lang Hancock and Hamersley and Robe River Railway to the port at Dampier. One year later, after the first Hope Downs mine proved so successful, it started on its second mine at the same site, Hope South. Hope Downs now had two giant mines exploiting the same ore body and 30million tonnes of iron ore is being transported to Dampier annually.

The Hope Downs Joint Venture employs over 500 people and is currently in the process of developing Hope 4 that has a resource of 364 million tonnes and a reserve base of 137 million tonnes. Hope 4 has the potential of doubling the current Hope Downs production.

Hancock Prospecting

Hancock Prospecting Pty Ltd (HPPL) is an Australian company that is operating in the Pilbara and the iron ore sector.Founded by Lang Hancock in 1952 a progression of 10 iron ore mines have been developed from original Hancock discoveries, the first being Tom Price in 1966.The company is now led by...........read more

ADDRESS

Hancock Prospecting
HPPL House 28-42 Ventnor Ave
West Perth, WA 6005

PO Locked Bag No 2
West Perth, WA 6872

OTHER INFO

Phone08 9429 8222
fax08 9429 8266

View Hancock Prospecting Page

We Currently have No Jobs Specified for

HOPE DOWNS

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Hope Downs

Y Fronts teaser banneriComplii MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

iComplii