Downer
HomeMinesWAHaoma
SUITE 4, 85 SOUTH PERTH ESP SOUTH PERTH WA , 6151
P: 08 6313 3800 F: 08 6313 3888
www.silverlakeresources.com.au

HAOMA

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

Silver Lake Resources acquired the Hoama gold deposit in 2007 when it purchased the Mount Monger tenements. It began mining ore from the Daisy Milano Mine the same year and extended the Daisy Milano decline from 32 level to mine the Haoma deposit in June 2011.


The Haoma Mine is Located Along the Mount Monger Road
The Haoma Mine is located 50 kilometres south east of the gold mining
centre of Kalgoorlie along the Mount Monger road. This is an all weather road for 35 kilometres leading into the mine site, although the first 15 kilometres out from Kalgoorlie is sealed bitumen. The Mount Monger tenements cover an area of 1,728 square kilometres.


Haoma Gold Deposit Accessed From The Daisy Milano Decline
At the same time as Silver Lake Resources acquired the Mount Monger gold operation in 2007, it also purchased the Lakewood Gold Processing Facility (LGPF) and immediately set about refurbishing the plant over the following four months. The first gold bar was produced from this facility by its new owners, Silver Lake Resources, in March 2008. The company discovered gold in the Daisy East ore body in July 2009 and the Rosemary deposit was accessed from the Daisy Milano mine's six level. The Haoma ore body being accessed via the Daisy Milano decline from levels 16,19,25,27,32,34 and 35.


The Mount Monger Operation has mined gold from Maxwells open pit as well as the Daisy Milano, Rosemary and Haoma underground mines. Mechanised mining methods only are used to mine ore at the Haoma deposit. Other gold deposits, either being mined or on the way to being mined at Mount Monger, include; Fly Camp, Santa, Cockeyed Bob, Imperial and Majestic.


Ore From the Haoma Deposit Processed at the Lakewood Gold Processing Facility
The gold processing plant, LGPF, where the ore from the Haoma ore body is processed, is 45 kilometres from the Haoma Mine and five kilometres from Kalgoorlie. The treatment process undertaken at the plant follows the conventional metallurgical method. Moderately hard ore is treated with around 80 percent of the gold being recovered by means of a gravity circuit before being exposed to cyanide leaching that gives a final recovery rate of around 96 percent.


Upgrades Lift Processing Capacity to One Million Tonnes a Year

Further upgrading of the treatment plant was completed in early 2010 that lifted the processing capacity from 300,000 tonnes annually to 600,000 tonnes. The latest upgrade was completed in late 2011 that increased the annual tonnage capacity to 700,000 of hard rock and 900,000 tonnes of soft rock ore. As a result of a new tailings storage facility being completed along with a ROM (run-of-mine) bin, the treatment facility can now be operated at a rate of one million tonnes a year.


Gold Mining Began in the Area in the 1900's

The Mount Monger gold operation, of which the Haoma Mine belongs, is within the Kalgoorlie Terrain of the of the mineral rich Eastern Goldfields of Western Australia. Gold mining was first carried out in the area in the 1900's. There are several historic working extending to the north following a shallow alluvial cover that leads to an ancient drainage channel. Early miners appear to have only exploited the sub cropping of deposits not mining any more than 80 metres below the surface.
Silver Lake Resources have stated they have an ongoing commitment to carry out further underground exploration of the Haoma deposit.
 

Silver Lake Resources

Western Australian based gold producing and exploration company with its main asset Mount Monger Operations located 50km south east of Kalgoorlie in the Eastern Goldfields.The companies Mount Monger operations which covers an area of 1,728 km2, has produced gold from Daisy Milano, Haoma and...........read more

ADDRESS

Silver Lake Resources
Suite 4, 85 South Perth Esp
South Perth, WA 6151

P.O. Box 876
South Perth, WA 6951

OTHER INFO

Phone08 6313 3800
fax08 6313 3888

View Silver Lake Resources Page

We Currently have No Jobs Specified for

HAOMA

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Haoma

Y Fronts teaser bannerDowner Group MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

Downer Group