About:

A LNG (liquefied natural gas) export facility is currently being constructed in Central Queensland at Gladstone. It is known as the Gladstone LNG Plant, or GLNG. The facility is being built by Santos Limited with a 30 percent shareholding, PETRONAS ( Petroliam Nasional Berhad) with a 27.5 shareholding and KOGAS with a 15 percent shareholding. The plant is being built to make use of the coal seam gas resource located in the Comet Ridge and Roma region of Queensland.

The Gladstone LNG facility will exploit coal seam gas fields located in areas such as Taroom, Injune, Emerald and Roma by bringing their production to the Gladstone facility by means of a 135 kilometre long gas transmission pipeline.

Gladstone LNG Facility to be Constructed in Three Stages

When complete the Gladstone LNG facility on Curtis Island, will be capable of supplying 10 million tonnes of LNG for the export market every year. The work needed to get to that stage of development requires the construction of considerable infrastructure, dredging for a deep water port, marine facilities, a bridge and an access road. The works is being carried out in three stages with the first stage allowing for the production of between three and four million tonnes of LNG a year.

Final Modules Installed in Gladstone LNG's two Processing Trains

The final shipment of modules required for the completion of the Gladstone LNG's processing trains arrived at the site last September. Over the previous 30 odd months a total of 111 modules had been assembled in the Philippines before being shipped to the Gladstone LNG site on Curtis Island to be installed in the two natural gas liquefaction processing trains being built at the facility.

Bechtel is Gladstone LNG's Principal Construction Contractor

Giant international construction company Bechtel is the principal contracting company responsible for delivering the modules with the assistance of about 3,500 workers employed by both Bechtel and Santos Gladstone LNG. The workers worked a total of 15 million man hours to assemble the modules in the Phillipines and have them delivered to the Gladstone LNG facility on Curtis Island. The final module shipment consisted of two 2,500 tonne propane chiller modules. These were the widest and heaviest to be assembled by Bechtel. The modules contained seventy percent of the Gladstone LNG plant's structural steel requirements,sixty percent of its piping needs and forty percent of the facilities overall construction requirements.

Gladstone LNG's First Shipment due in 2015

Gladstone LNG is planning to have its first shipment of LNG leave its Curtis Island plant in 2015. To this end the recent commissioning of natural gas being fed into its 420 kilometre gas pipeline from the compressor station on the Fairview field in south west Queensland was an important milestone in the development of the Queensland LNG industry generally. This pipeline alone, when fully operational, will have the capacity to carry up to 40 million cubic metres of natural gas a day from the gas fields to the Gladstone LNG Plant.

When the gas reaches the Gladstone LNG facility on Curtis Island it will be cooled to a temperature of minus 161 degrees Celsius. This will allow the liquefied gas to be transported as LNG to the company's overseas customers. The building of the pipeline to bring the gas to the Gladstone plant began in 2012. To date it has cost over six million hours of work with more than 36,000 welding segment taking place on the 250,000 tonnes of 1.05 metre diameter pipes. The pipeline has been constructed by Saipem Australia.

Santos

Santos is one of Australia's largest producers of oil and gas, to the domestic market.Its name is an acronym for South Australia Northern Territory Oil Search.Santos' first discovery of gas was in he Cooper Basin in 1963. Today the Cooper Basin contains around 190 gas fields and 115 oil fields...........read more

ADDRESS

Santos
60 Flinders St
Adelaide, SA 5000

GPO Box 2455
Adelaide, SA 5001

OTHER INFO

Phone0881165000
fax0881165050

View Santos Page

We Currently have No Jobs Specified for

GLNG GLADSTONE LNG FACILITY

Visit Jobs Section

Bechtel Australia has a contract role at glng-gladstone-lng-facility

With headquarters in San Francisco, Bechtel is a privately owned company with offices around the world. Employing over 53000 people and providing services such as engineering, construction and project management over various sectors, like energy, mining, oil and gas, transportation and ...Read More

ADDRESS

Bechtel Australia

Brisbane, QLD 4006

OTHER INFO

Phone07 3167 5000
fax07 3167 5001

More info about Bechtel Australia

Following are the resources mined at Glng Gladstone Lng Facility

Y Fronts teaser bannerDowner Group MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

iComplii