National Pump and energy
HomeMinesWAEdna May Westonia
LEVEL 3, 1 ALTONA STREET WEST PERTH WA , 6005
P: 08 6216 9700 F: 08 9321 8804
www.evolutionmining.com.au

EDNA MAY WESTONIA

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The Edna May-Westonia Mine, that is owned by Evolution Mining Limited, has a long history going back over 100 years. Underground mining actually began at Edna May as early as 1910. The operation was suspended in 1922 but resumed again in 1948. The open pit mine at Edna May began production in 1985 and the then owner, ACM, developed a decline at the site and began underground stoping on a small scale.


First Gold Poured at the Rejuvenated Edna May-Westonia Mine Occurred in April 2010
The current owner of the Edna May-Westonia gold mine poured the first gold produced by them from the mine in April 2010 and announced plans to have the operation producing between 75,000 and 80,000 ounces of gold a year by 2013. They are operating the Edna May-Westonia mine as an open pit mine at the present time but are looking towards developing an underground operation at the site in order to extend the life of the mine which is currently nine years.


Evolution Mining Limited is the Fourth Largest Gold Producer in Australia
Evolution Mining Limited is the fourth largest gold producer in Australia who also own the Cracow, Pajingo, Mount Carlton and Mount Rawdon gold mines. It forecasts the total gold production from the five mines will reach between 370,000 and 410,000 ounces by the end of the 2013 financial year. The company was formed as a result of the merger of Conquest Mining Limited and Catalpa Resources Limited. It purchased the Mount Rawdon and Cracow mines in Queensland from Newcrest Mining Limited.


Owner Operator Fleet a feature of the Edna May-Westonia Mine

Open pit mining at the Edna May-Westonia Mine is carried out via a conventional drilling, blasting. loading and haulage method. This bulk mining technique has been adopted to facilitate the mining of the high grade reef structures of the Edna May-Westonia deposits. It allows the company to use a single fleet of mining vehicles that are all owner operated. The open cut is being mined with 10 metre benches and 2.5 metre flitches over four stages.


Edna May-Westonia Mine Processes 2.6 Million Tonnes of Ore Annually
Evolution Mining Limited's gold treatment plant at the Edna May- Westonia Mine is capable of processing 2.6 million tonnes of gold bearing ore a year and this is in the process of being increased to 3 million tonnes. This increased throughput will better cater for the the extra ore that will come from the widening of the open pit by means of staged cutbacks as it will give long term access to the ore body. At the present time there are 180 people employed at the Edna May-Westonia gold mine as part of the company's workforce or as contractors.


The Edna May-Westonia gold processing plant was purchased from Harmony Gold after they closed the Big Bell gold mine near Cue in Western Australia in 2003. The entire plant was transported from the Big Bell mine site to Edna May-Westonia mine site where it was re-constructed in 2007. The plant consists of a 3.7MW ball mill and a 2.0MW SAG mill along with a conventional CIL (carbon-in-leach) process. The process obtains a gold recovery rate of around 92 percent.
 

Evolution Mining

Created in 2011 through a merger of Catalpa Resources Ltd and Conquest Mining Ltd and the concurrent acquisition of Newcrest Mining’s interests in the Cracow and Mt Rawdon mines, Evolution Mining is a leading, growth focused Australian Gold Company. Operating five gold & silver mines in...........read more

ADDRESS

Evolution Mining
Level 3, 1 Altona Street
West Perth, WA 6005

PO Box 1300
West Perth, WA 6872

OTHER INFO

Phone0862169700
fax0893218804

View Evolution Mining Page

We Currently have No Jobs Specified for

EDNA MAY WESTONIA

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Edna May Westonia

Y Fronts teaser bannerDowner Group MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

iComplii