National Pump and energy
HomeMinesQLDEastern Creek
LEVEL 38 GATEWAY, 1 MACQUARIE PLACE SYDNEY NSW , 2000
P: 02 9253 6700
www.xstratacoal.com

EASTERN CREEK

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About: The Eastern Creek open cut coal mine in the northern Bowen Basin region of Queensland is an extension of the Newlands coal mine. The mine is located 30 kilometres north west of Glenden, the closest town to the mine that has a population of around 1,360 people. It is also sited 140 kilometres west of Mackay, the largest regional centre. Glenden was founded in 1983 to service the Newlands coal mine and remains the main service centre and accommodation area for contractors and mine employees working in the area.

Eastern Creek Extension to use Same Infrastructure and Workforce

The Eastern Creek extension comprises around 11,674 hectares west of the Redcliffe Tableland. It is crossed by three creeks, Cerito Creek, Wilson Creek and Eastern Creek that make up the upper reaches of the Burdekin River catchment. The existing Newlands mine comprises of 11 mining leases covering an area of 20,166 hectares. The Eastern Creek mining operation makes use of the Newlands mine infrastructure that includes the coal handling and preparation plant, the reject and tailings disposal areas, the administration offices, warehouse complex, water and sewage treatment facilities, haulage roads, explosive storage, airstrip, workshops and rail load out facility.

Eastern Creek Mine Part of the Newlands Group of Four Mines

The Newlands mine produces around 10.5 million tonnes of product export coal annually and consists of four distinct mining operations, these being; (1) the main deposit, which includes the Northern Underground mine and an open cut mine, it also houses the CHPP (coal handling and processing plant), (2) the Eastern Creek open cut mine, (3) the Suttor Creek open cut mine and (4) the Wollombi open cut mine.

These four mining operations had sufficient coal reserves to allow their underground and open cut mines to operate at full capacity until 2013 , when, to be able to continue operations at the same level, it required mining of the Eastern Creek extension, using the same workforce and infrastructure. Without the Eastern Creek extension becoming available the mine would not remain commercially viable after 2015 for its underground mine and 2023 for its open cut operations. Although the Eastern Creek and the Northern Underground extensions will prolong mining operations at the Newlands complex to 2042, the mine's annual ROM (run-of-mine) production level will remain constant.

Eastern Creek Mine is Part of the NCA Project

Eastern Creek, is part of Newlands Coal NCA Project, a steaming and coking coal producer involved in coal mining, processing and exporting, that, besides encompassing the Newlands open cut and underground mining activities, it also includes the Collinsville open cut coal mine and the Abbot Point coal terminal on the coast from where its coal production is exported overseas. The project is owned by joint venture partners; Xstrata Coal with a 55 percent interest, Itochu Coal Resources with 35 percent and Sumitomo with 10 percent. The Abbot Point terminal is owned by Ports Corporation of Queensland.

Xstrata Coal

Xstrata Coal's Head Office is based in Sydney NSW but they operate globally. Employing more than 17,000 people including contractors with the majority working in Australia. Xstrata has been included on the Dow Jones Sustainability Index since 2006.Operations include both underground and open cut...........read more

ADDRESS

Xstrata Coal
Level 38 Gateway, 1 Macquarie Place
Sydney, NSW 2000

OTHER INFO

Phone02 9253 6700

View Xstrata Coal Page

We Currently have No Jobs Specified for

EASTERN CREEK

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Eastern Creek

Y Fronts teaser bannerDowner Group MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....