About:

Hong Kong listed investment company Snow Peak Mining Pty Ltd has completed the purchase of the troubled Kagara Limited's North Queensland mining tenements that includes the Dry River South copper mine that remains on care and maintenance while its future is evaluated by its new owners.

Dry River South Mine Placed on Care and Maintenance

The Dry River South underground mine just over 100 kilometres south west of Cairns, near the town of Greenvale, came online in 2004 and at its peak employed 280 people who were flown in and flown out from Townsville and Cairns to complete their rostered shifts of eight days on and six days off. Although the mine produced zinc, silver, lead and gold, copper was its mainstay, especially after Kagara developed an adjacent copper mine, Balcooma. However, in the latter half of 2008, both the Dry River South and the Balcooma mines were suspended. Mining commenced again in early 2009 but were placed on care and maintenance near the end of 2011.

Snow Peak Mining Pty Ltd Take Over Dry River South Mine

In early 2013 it was announced that the Hong Kong investment company Snow Peak Mining Pty Ltd had signed an agreement to acquire the problematic Kagara Limited's North Queensland assets and that the mines operated by Kagara would be taken over by Snow Peak's fully owned Australian subsidiary Consolidated Tin Mines. Snow Peak had already had an interest in the Mt Garnet area where the Dry River South mine is located with its operation of a nearby tin mine.

Concentrator the Main Magnet Drawing Snow Peak Interests to Dry River South Assets

Dry River South workers were retrenched when the mine was placed on care and maintenance while Consolidated Tin Mines evaluate the viability of restructuring. The company has stated it plans to operate the Kagara concentrator at Mt Garnet, adjacent to the Dry River South Mine, to process copper from the Balcooma and Survey Mines on a short term basis. It is their long term plan to re-configure the concentrator to primarily process tin from their Mt Garnet Tin Project.

The Dry River South concentrator has a capacity to process 1,000,000 tonnes of copper and base metals a year. Its poly metallic and copper circuits handling 500,000 tonnes annually for each metal. The concentrator is only nine kilometres via a sealed road from Consolidated Tin's Gillian Tin deposit which has a near surface tin resource of three million tonnes of tin ore containing .78 percent tin.

Major Points in Mine Takeover Arrangements

Major points of the Snow Peak purchase of the Kagara assets include the following:

  • -The one million tonne capacity concentrator in good operating condition
  • -The strategic advantage to the company's ongoing development of its Mt Garnet Tin Mining Project
  • -The concentrator will initially be used to process poly metallic and copper ore from Kagara's existing mines
  • -The concentrator will eventually be re-configured to enable it to process tin bearing ore

What will eventually be the fate of the Dry River South Mine will depend greatly on how prices move into the future. At the moment Snow Peak Mining is intending to take full advantage of buoyant tin prices. In the meantime the Dry River South, Balcooma and Survey copper mines look as if they may have to play the waiting game.

Consolidated Tin

Consolidated Tin is a tin exploration and developing company. Their major project is the Mt Garnet Tin Project near Cairns in Northern Queensland, Australia.

ADDRESS

Consolidated Tin
395 Lake Street
Cairns, QLD 4870

395 lake street
cairns, QLD 4870

OTHER INFO

Phone07 4032 3319
fax07 4027 9429

View Consolidated Tin Page

We Currently have No Jobs Specified for

DRY RIVER SOUTH

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Dry River South

Y Fronts teaser bannerDowner Group MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....