National Pump and energy
HomeMinesNSWDonald
LEVEL 29, 2 CHIFLEY SQUARE SYDNEY NSW , 2000
P: 02 9375 2361 F: 02 9375 2121
info@astronlimited.com
astronlimited.com/index.html

DONALD

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The Donald minerals sands project, that is located 300 kilometres north west of Melbourne in Victoria's Murray Basin Region, is host to a zircon deposit valued over $2.1 billion. One of the top five zircon deposits in the world.

Donald Orebody Discovered by CRA

The zircon depost at Donald was discovered, and initially owned, by CRA

Limited which became part of Rio Tinto. Current owner Astron Limited acquired it from Zirtanium in 2004.

The Donald Zircon project is a world class mineral sands deposit that is to be mined by means of a conventional open cut method with a life of mine of 31 years. Once mined, the mineral sand will be processed on-site via a mineral separation facility for the purposes of separating the various minerals such as leucoxene, ilmenite and rutile as well as zircon.

Donald Mineral Sands Project Located Near Existing Rail and Road Infrastructure

The Donald mineral sands project is situated near already existing infrastructure such as road and rail that is able to transport the product to existing ports on the coast. Much of the product produced at the on site mineral separation facility at Donald will be made using technical processes that have been developed by Astron Limited in China.

Mining at the Donald Mineral Sands Project Will be Undertaken by Means of Open Cut

The first stage of mining to be undertaken at the Donald mineral sands operation will be a single open cut pit using excavators and trucks operated by a contract mining company that will be awarded an initial six year contract. Production will be ramped up to full production by the creation of an additional mining face operating from the southern end of the pit advancing towards the north. Following treatment of the ore at the on-site separator it will be taken to China for further treatment after which it will be sold on the world market, supplying eight percent of the world's zircon requirments and four percent of the world demand for titanium.

Initial production of heavy mineral concentrate from the Donald mineral sand operation will be around 475,000 tonnes of heavy mineral concentrate that will be increased to 950,000 tonnes within four years.

Donald Mineral Sands Production Planned for 2016

Astron Limited is planning on commencing production at the Donald mineral sands open cut mine in the first quarter of 2016. Construction and engineering work on the site is expected to take around two years with the ramp up to full production taking another 21 months.

Mineral sand reserves at the Donald deposit total 461 million tonnes grading at 33.6 percent ilmenite, 19.1 percent zircon, 18.9 percent leucoxene, 7.5 percent rutile and 5.9 percent heavy minerals.

Donald Project Undertaken by Chinese Based Company Astron Limited

Astron Limited is a mineral sands mining organisation that is listed on the Australian Securities Exchange (ASX). The company has a minerals sands trading operation in Shenyang, China, as well as a zircon and titanium chemical and research business in Yingkou, China. Astron has been involved in the mineral sands business for the last 25 years.


Astron

Mineral sands mining company, Astron is listed on the ASX and is incorporated under the Group's Hong Kong company Astron Corporation. It is focused on developing its two mining projects – Donald in Victoria, Australia, and Niafarang in Senegal, West Africa.The Donald open cut mine was acquired...........read more

ADDRESS

Astron
Level 29, 2 Chifley Square
Sydney, NSW 2000

OTHER INFO

Phone0293752361
fax0293752121

View Astron Page

We Currently have No Jobs Specified for

DONALD

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Donald

Y Fronts teaser banneriComplii MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....