About: The Dolphin Scheelite mine, on the south east coast of King Island, near the town of Grassy, off the north west coast of Tasmania, is in the process of being reopened by King Island Scheelite.

The Dolphin Scheelite Mine has a Long History at Grassy

King Island Scheelite has previously mined for tungsten trioxide in the form of scheelite at the Dolphin Mine, first as an open pit and more recently as an underground operation. It is the underground mine that is currently being proposed for reopening. The town of Grassy was originally created to service the original mining of scheelite in the area.

New Dolphin Workings to Produce 3,500 Tonnes of Concentrate a Year

The Dolphin and Bold Head mines and associated tailings at Grassy host scheelite deposits totalling 9,109,000 tonnes that contain 81,720 tonnes of tungsten trioxide (WO3). Besides the re-opening of the Dolphin underground mine the project is planned to build a processing plant capable of producing 3,500 tonnes of tungsten trioxide concentrate annually.

Original Dolphin Mine Closed in 1990

The Dolphin mine was worked as an open pit mine until 1975 when it was decided to continue operations underground until it closed in 1990 because of the low world tungsten price. Another underground scheelite mine at Bold Head was closed at the same time. All equipment was removed from the two mines following the closures with the old unused Dolphin pit left to flood. The sites were then rehabilitated.

New Dolphin Mine to be an Underground Operation

It is planned to mine the Dolphin scheelite deposit using the existing underground workings with the ore being processed in a new processing plant that is yet to be constructed. The Bold Hill mine and further deposits below the current Dolphin workings are to be accessed at a later date.

The Dolphin project requires the dewatering of the former workings and the rehabilitation of the existing decline from the bottom of the old open pit. It is proposed to employ a contractor to manage and operate the underground operation at the new Dolphin workings. The mine will be expected to produce 350,000 tonnes of ore a year utilising post-pillar stoping and using classified tailings for hydraulic filling purposes.

Successful metallurgical testing has been carried out in China from which a mill design and flow sheet has been developed that is based on whole ore flotation with high mill performance and low cost operation. The mill is expected to produce at least 3,500 tonnes of 65 percent tungsten concentrate a year. This concentrate will be shipped to customers inside shipping containers. The Dolphin project will be able to produce up to five percent of world tungsten needs and 25 percent of the world supply when discounting that used by China. The Dolphin mine processing plant is to be established near the pit below the Grassy dam. The previous dam site will be utilised as a tailings dam for the new operation.

King Island is serviced by air and sea transport, mainly from the Tasmanian mainland. Its deep water port is located only one kilometre from the Dolphin mine site. An airport is located a half hour away via a sealed road. King Island's main town of Currie is located 25 kilometres by road from the mining town of Grassy.

King Island Scheelite

King Island Scheelite Limited's (KIS) main focus is to redevelop the tungsten mines on King Island in Tasmania. KIS has a long history of mining Tungsten on the island, the former operations closed in 1990 due to low tungsten prices. The company is now in a position to redevelop the Dolphin...........read more

ADDRESS

King Island Scheelite
Level 26, 259 George ST
SYDNEY, NSW 2000

OTHER INFO

Phone0286221400
fax0286221401

View King Island Scheelite Page

We Currently have No Jobs Specified for

DOLPHIN

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Dolphin

Y Fronts teaser bannerDowner Group MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....