DEFLECTOR

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The Deflector Gold Mining Project is located in the Southern Murchison region of Western Australia, about160 kilometres east of Geraldton and 450 kilometres north of Perth. It was acquired by Doray Minerals Limited in early 2015 as part of the takeover of Mutiny Gold Limited.

The Deflector Mine has a Mining Life Expectancy of six Years

The Deflector project consists of a high grade gold, silver and copper ore body with an estimated mining life of six years. However, there also exists considerable exploration potential for additional development along the, so far under-explored, seven kilometre long mineralised corridor of which the deflector deposit is part of.

Deflector to be Doray Minerals Second Producing Mine

The development of the Deflector Project will be Doray Minerals Limited's second project to be taken from the development stage to one of production. The first being the highly successful Andy Well gold mine located in the same Southern Murchison area. In fact the Deflector ore body has many similar characteristics to that of the Andy Well deposit as both possess a narrow, shallow vein and both are high grade deposits that can be mined predominately as underground mining operations.

Deflector Mine to be Fully Operational by 2016

A new gavity based flotation gold processing plant is to be constructed at the Deflector Project site to minimise haulage costs. It will be able to process copper and gold/silver content. The processing plant will be able to adequately recover gold bullion from a gravity circuit before it begins the process of producing a copper/gold/silver concentrate from its flotation facility. The concentrate is to be sold on commercial terms. The Deflector mine will significantly increase Doray Minerals Limited's mineral production and as such, is a major part of the company's ongoing project pipeline and enhanced asset portfolio. For this reason Doray Minerals Limited plan to develop the Deflector Project as early as possible and to have it at the production stage by 2016.

Doray to Draw on Andy Well Experience to Develop the Deflector Project

In order to fast track the development of the Deflector gold mining project, Doray Minerals Limited are to optimise the design of the operation and to begin construction work as soon as possible. Plant construction is scheduled to commence during the June Quarter of 2015 with open pit mining expected to start during the September Quarter, 2015. The company expects it will be able use the experience gained from the development of the Andy Well mine to optimise the work needed to be done to construct the deflector mine.

The Deflector open pit ore body, where mining activity is planned to commence, is situated beneath a rather thin transported cover. This deposit will initially produce transitional and oxide ore while the underground mine is still under construction. Access to the underground operation will be adjacent to the central lode.

The underground mine to be developed at the Deflector gold, copper and silver mining site will access the narrow high grade veins in the Deflector ore body. These veins exist in excellent pillow basalt host rocks. The ore is found to exist in three separate lodes, these being; Contact, Central and West lodes. There is good stand off distances between each lode and their strike continuity and vertical nature making them perfect for narrow vein mechanised underground mining operations traditionally practiced in Western Australia.

Doray Minerals Limited

Doray Minerals Limited is an Australian gold exploration, development and mining company with specific exploration interests in the Murchinson area of Western Australia and number of gold prospects in the Central Gawler Region. The company has two projects to its name; the already operational...........read more

ADDRESS

Doray Minerals Limited
41-43 Ord Street
West Perth, WA 6005

PO Box 284
West Perth, WA 6872

OTHER INFO

Phone0892260600
fax0892260633

View Doray Minerals Limited Page

We Currently have No Jobs Specified for

DEFLECTOR

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Deflector

Y Fronts teaser banner MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....