About:

Coalpac, the company that operates the Cullen Valley black coal mine in the Central Tablelands of New South Wales is, in turn, owned by private Melbourne family owned company, CET Resources. Coalpac have owned coal mines in the area around Lithgow since 1989. The company had up until recently, state government approvals to produce over 2 million tonnes of coal a year, for the domestic market. However, it is presently engaged in negotiations to allow it to lift production levels that would allow it to enter the thermal coal export market. The expansion needed to widen their market included the following:


• Port and rail access to allow it to enter the export market

• The ability to continue to supply their current domestic market as well as their export ambitions

• An increase in annual production rate to three and a half million tonnes a year by 2015

Open cut Mining Centred Around a Central Hill

The Cullen Valley Coal Mine is near the Baal Bone and Invincible Collieries and five kilometres from the Mount Piper Power Station that has been taking 90 percent of its total coal production. The coal seam the Cullen Valley taps into is part of the Illawarra coal measures that consist of outcropping and a central hill that the mine is developing itself around in a clockwise direction. The Cullen Valley Mine mines into the hill as far as can economically afford to go. The maximum seam strip being five bank cubic metres to one tonne of coal. This depends a lot on the quality of the coal being extracted.

Expansion to add 21 Years to the Life of the Mine

The expansion program of the Cullen Valley Mine will extend the life of the mine for a further 21 years. To date the mine has continually evolved from an original underground operation as far back as the latter half of the 1800's. The proposal put forward for expansion approval included the following:


• Plans for rehabilitation of the site

• The necessity of clearing 960 hectares of vegetation in the Ben Bullen State Forest

• The production of 640,000 tonnes of sand products annually

• The upgrading and construction of infrastructure necessary to allow the production of 3.5 million tonnes of coal a year as well as transporting the product from the mine site by both rail and road

• Expanding the high wall and open cut mining capabilities to allow the mining of an extra 108 million tonnes of coal

• The employment of 120 more employees and contractors for the next 21 years

Coal Processing Takes Place On Site

Coal processing and handling is taken care of at the Cullen Valley Mine Crushing Plant with a coal de-shaling plant still at the planning stage. The mine also has its own administrative offices, storage facilities, workshops and bathhouses. Approval has been given for the commencement of underground operations to take place at the Cullen Valley Coal Mine but has not yet been acted upon. The continuation of Cullen Valley coal mining west of the Castlereagh Highway will allow it to access an additional 40.1 million tonnes of coal.

Update-Both the Cullen Valley Coal Mine and the company's adjacent Invincible Colliery have been placed in care and maintenance status since 2013, when their coal reserves had either become uneconomic to mine, or had become exhausted. The decision to not allow the mines to expand was a blow to the region's economic outlook as coal mining had been carried out in the area for the last 50 years.

Coalpac

Coalpac is a privately owned mining company that mines, markets and processes coal.The company currently has operations in New South Wales, with their Invincible Colliery and Cullen Valley mines. They have been functioning mines in the Lithgow region since 1989.

ADDRESS

Coalpac
Castlereagh Highway
Cullen Bullen, NSW 2790

PO Box 330 Indooroopilly Centre
Indooroopilly, QLD 4068

OTHER INFO

Phone02 6359 0600
fax02 6359 0608

View Coalpac Page

We Currently have No Jobs Specified for

CULLEN VALLEY

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Cullen Valley

Y Fronts teaser bannerDowner Group MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....