doing fifo financially smart
HomeMinesQLDCoppabella
100 MELBOURNE STREET SOUTH BRISBANE QLD , 4000
P: 07 3225 5500 F: 07 3225 5555
info@peabodyenergy.com
www.peabodyenergy.com/content/398/australia-mining

COPPABELLA

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The Coppabella Coal mine is located 140 kilometres south west of Mackay in Queensland in the rich coal producing region of the Bowen Basin, near the little townships of Moranbah and Nebo. It is an open pit and operated in the conventional manner of strip mining utilising excavators, shovels and trucks.

Low Volatile Pulverised Coal Injection

The Coppabella mine produces a low-volatile pulverised coal injection (PCI) product specifically for the export market. This is a more cost efficient coal that helps reduce the consumption of the more expensive coke in the production of iron and steel. The injecting of pulverised coal into a furnace lessens the amount of coke required and thereby lowers the operating cost in the making of pig iron and crude steel. Most steel manufacturers are now utilising a coal injecting system into their blast furnace operations. Chinese steel manufacturers have always used a low volatile hard anthracite (coal) for pulverised coal injection purposes as it is a cheaper method when compared to the installation of a coke oven. One tonne of low volatile PCI coal replaces one and a half tonne of expensive coking coal. The high demand for coke around the world has created a shortage and therefore increased its price. The use of low volatile PCI coal, such as that produced at the Coppabella mine, is therefore a way of combating this shortage.

Production Levels Closing in on Full Capacity

The Coppabella mine began producing coal for the export market in 1988 and now has a capacity of producing almost five million tonnes a year. It actually obtained a production level of 3.2 million tonnes in 2012 and this is expected to increase to four million tonnes in 2014. Coppabella is actually an amalgamation of four separate pits; East Pit, South Creek and Johnson. The thickness of the average coal seams running through these pits is 10 metres and coal produced at the Coppabella mine is processed on site before being transported to a stockpile and railed to the terminal at Dalrymple Bay for shipping overseas.

A Mine Owner With a Community Consciousness

The Coppabella mine was previously owned by Macarthur Coal Limited, however, Macarthur's 73 percent ownership has been acquired by global miner Peabody through its Australian subsidiary Peabody Energy Australia PCI and it is now employs around 550 people, contractors included. The company is proud of its community consciousness and supports many local events and causes such as the Nebo Bushmans Carnival, the Coppabella state school and the RACQ Central Queensland Rescue helicopter.

Mining and Rehabilitation Working Close Together

Coppabella open cut mining operations consists of a dragline, shovel, excavators and trucks. The electrically driven shovel pre-strips and removes the overburden after it is first drilled and blasted to expose the coal seams. The exposed coal deposit is then mined with hydraulic excavators. The coal is taken from the pit with coal trucks to either a general stockpile, or the ROM (Run of Mine) storage. From there it is taken to the coal handling and preparation plant (CHPP) to be made ready for transportation to the coast for export.

Rehabilitation of the land area as mining moves on is also carried out as soon as possible after it is mined out. In 2011 alone 321 hectares were rehabilitated at Coppabella and the latest reports show that the ecosystem that was involved in the rehabilitation is currently both diverse and robust.

Peabody Energy

From humble beginnings, a 24 year old Francis. S Peabody started selling high quality coal to homes and businesses throughout Chicago in 1883 from the back of his cart. Within 7 years Francis opened his first coal mine in Williamson County.In 1903 Peabody won its first coal supply agreement with an...........read more

ADDRESS

Peabody Energy
100 Melbourne Street
South Brisbane, QLD 4000

OTHER INFO

Phone07 3225 5500
fax07 3225 5555

View Peabody Energy Page

We Currently have No Jobs Specified for

COPPABELLA

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Coppabella

Y Fronts teaser bannerDowner Group MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

iComplii