doing fifo financially smart
HomeMinesWAConiston Novara
100 ST GEORGES TERRACE, LEVEL 9 PERTH WA , 6000
P: 08 6218 7100 F: 08 6128 7200
infoaustralia@apachecorp.com
www.apachecorp.com

CONISTON NOVARA

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The Coniston-Novara sub-sea oil field development is located in Australian waters off the coast of north Western Australia, about 65 kilometres north of Exmouth. The project involves the development of the two oilfields by means of a tie-back to under-sea infrastructure that is already in place and being used by the adjacent Apache owned and operated Van Gogh oil field development project. The Coniston-Novara oil field development will also use the,'Ningaloo Vision,' an in-place Floating, Production, Storage and Offloading vessel (FPSO) which is also associated with the Van Gogh operation, that is moored only eight kilometres north of the two oil fields.

Coniston-Novara oil Project Owned by Apache and INPEX

The Coniston-Novara project is a joint venture operation owned by Apache Energy, an American based international oil company, and INPEX Corporation, a Japanese oil company that was established in 1966 as, North Sumatra Offshore Petroleum Exploration Company Limited.

Coniston-Novara oil Wells in sea at Depths up to 400 Metres

The Coniston-Novara under-sea development project will be comprised of six production wells in the Coniston oil field and one in the Novara field. The six Coniston wells will be connected to a new under-sea manifold for the Coniston field and a Pipe Line End Manifold (PLEM) for the Novara field well. The wells are in water at varying depths of between 340 and 400 metres.

Van Gogh Infrastructure to be Shared with the Coniston-Novara Development

Dry gas, which will be required as a gas lift, will come from the FPSO through new four inch and six inch gas injection lines. A new umbilical will connect the PLEM and the new manifold, to the existing Van Gogh infrastructure. This will provide chemical injection as well as control and monitoring capability. Fluids from the Coniston and Novara wells will be tied to the existing Van Gogh infrastructure through two 12 inch production flow lines that pass to the FPSO by way of riser basins and flexible flowlines.

The Coniston-Novara oil field development will require some minor modifications to be made to the FPSO to allow it to accept production from the new fields. It is scheduled to make these modifications when the FPSO is in dry dock for the purposes of maintenance and repair work. While the 'Ningaloo Vision' is in dry dock upgrading work will also be carried out on the existing Van Gogh under-sea equipment. All this work is expected to be completed and production from the Coniston-Novara oil wells brought into production in 2014.

The Coniston oil field is expected to produce 22,000 barrels of oil a day, on average for the first year of production. It has oil reserves of around 15.7 million barrels. The FPSO, 'Ningaloo Vision' has the capacity to process 150,000 barrels of liquids a day, this includes the production of 63,000 barrels a day and storage provision for 540,000 barrels of oil. The vessel can also accommodate up to 60 people.

Apache Corporation in Australia is focused developing its off shore Western Australian oil and gas fields in the Carnarvon, Exmouth and Browse Basins. The company has been operating in the area since it acquired the gas processing facility on Varanus Island in 1993.


Apache Corporation

Founded in 1954 in Minneapolis, Minnesota,as Apache Oil Corporation and in 1956, the company was one of the first firms to register a drilling program with the U.S. Securities and Exchange Commission.The company’s name was changed to Apache Corporation in 1960, and for the next two decades the...........read more

ADDRESS

Apache Corporation
100 St Georges Terrace, Level 9
Perth, WA 6000

OTHER INFO

Phone0862187100
fax0861287200

View Apache Corporation Page

We Currently have No Jobs Specified for

CONISTON NOVARA

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Coniston Novara

Y Fronts teaser banner MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

Downer Group