doing fifo financially smart
HomeMinesWACloudbreak
LEVEL 2, 87 ADELAIDE TERRACE EAST PERTH WA , 6004
P: 08 6218 8888 F: 08 6218 8880
fmgl@fmgl.com.au
www.fmgl.com.au

CLOUDBREAK

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The Cloudbreak open cut iron ore mine in Western Australia's rich mineralised Pilbara, has been mining and processing over 40 million tonnes of iron ore a year ever since it first began production in 2008.

Iron Ore Deposits at Cloudbreak Exist in Vertical Formations

Where the conventional method of removing overburden at the Cloudbreak open pit mine by means of blasting the rock, shovelling it into trucks and placing it in areas that have been mined out, is carried out in the usual manner, the operator had to devise a more radical way of extracting the ore itself. This was because the ore exists in vertical deposits. Once extracted, ore is handled in the following manner:

• Once the iron ore is extracted it has to undergo screening de- sanding and crushing at the Cloudbreak ore processing plant. This processing plant prepares and refines the iron ore before it is stockpiled to await transporting.

• The loadout facility used to load the train wagons is able to load the 2.7 kilometre long trains at a rate of 16,000 tonnes of ore an hour. Each train carries a load of 30,000 tonnes.

• Once loaded the train takes its load 256 kilometres to the company's ship loading facility at the Herb Elliot Port at Port Hedland.

• The Fortescue railway line is constructed so it is able to withstand individual wagon axle weights of 40 tonnes, the heaviest in the world. The company rail stock comprises 900 freight wagons and 15 GE diesel locomotives. These make up four trains that make the journey from the Cloudbreak Mine to the coast in five hours. The first train to leave the Cloudbreak open cut iron ore mine to travel to Port Hedland did so on April 5, 2008.

• The Herb Elliot Port facility at Port Hedland, that covers an area of two million square metres, incorporates both shipping and railway infrastructure and is owned and operated by 'The Pilbara Infrastructure,' a fully owned subsidiary of Fortescue Metals.

Open Cut Strip Mining Method Used at the Cloudbreak Open Cut Mine

The ore deposits at the Cloudbreak open pit mine are extracted by means of open cut strip mining. The various pits are progressively mined with the removed overburden used as backfill for the older pits. However, it is found necessary for groundwater levels to be lowered to below the pit floor. This is obtained by re-injecting water, by means of injection bores and multiple pipes, into several acquifers. The ore itself is removed with the use of surface miners, excavators and face shovels. The larger and more advanced 4200 surface miners were installed at the Cloudbreak Mine in 2011. When the occasion arises whereby narrow bands of ore have to be removed, that the surface miner can't access, excavators are used.

Big Expansion Planned

Fortescue is currently planning an expansion of its Cloudbreak Mine from its present 30 hectares to 45 hectares. This will allow it to increase production to 50 million tonnes a year over a 14 year period. Part of the expansion will include an upgrading of the ore processing plant to allow it to accommodate an ore wash facility that will wash the saline ore that is occasioned during the latter stage of mining out a strip. The depth of the pit will also be increased to 90 metres below the surface.

Fortescue Metals Group

Fortescue Metals Group is the fourth largest iron ore producer in the world. The company was first created in 2003 with the first ore shipped in may 2008.Operations with the company exist in the Pilbara region of Western Australia.

ADDRESS

Fortescue Metals Group
Level 2, 87 Adelaide Terrace
East Perth, WA 6004

OTHER INFO

Phone08 6218 8888
fax08 6218 8880

View Fortescue Metals Group Page

We Currently have No Jobs Specified for

CLOUDBREAK

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Cloudbreak

Y Fronts teaser banner MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

Downer Group