About: The Challenger Gold Mine in South Australia has come about after gold was discovered there by Dominion Mining Limited in 1995. However, nothing was done about developing the project as the company was more focused on other projects it was working on at the time, with its then partner, Resolute Ltd.

Seven Year Wait to Start Mining Operations At the Challenger Mine

Work first began on developing the Challenger mine in 2002 when an open cut pit was established. The open cut was converted to underground mining in 2005. In 2005 it produced 43,547 troy ounces of gold and a year later, 2006, it produced 108,080 ounces of gold. 250 people are now employed at the Challenger mine. All are housed in camp village accommodation when working their roster at the site after being flown in to work their shift and flown out again at the finish.

Kingsgate and Leighton Contracting Have Built One of the Most Productive Gold Mines in Australia
Kingsgate Consolidated Limited currently own the Challenger gold mine that is operated for them by Leighton Contractors who provide all its mining needs using traditional uphole stoping methods of mining. It is regarded as one of the most productive gold mines currently operating in Australia.
Mining contractor, Leightons, utilise mechanised development underground for stoping using a longhole drill and blasting methods. They also bog using tele remote technology, conduct the haulage and carry out all maintenance requirements. To do this successfully they have a complete range of equipment and plant at their disposal. The mine operates continuously, 24 hours a day over the whole 365 days of the year.

It all Started With a two Year Life Span
When the challenger mine first started, in 2002, it was given a life span of two years. Nine years later, in 2011 it poured its 24th tonne of the precious metal. An amazing achievement considering its isolation in the distant South Australian outback. At the present time it has the following proud achievement record:
24,000 metres of diamond drilling each year
200,000 metres of production drilling annually
7,000 metres of horizontal development every 12 months and
600,000 tonnes of gold bearing ore mined annually

The Challenger Gold mine has a short but proud history to look back on already, particularly when you take into account the long hesitation shown by its original owners into developing it in the first place. Past achievements include:
The initial open pit which started in 2004 was developed to a depth of 125 metres below the surface
Underground development started in 2004 requiring the construction of surface facilities and a decline. It was in full production half way through 2005.
By June 2009 the M1 decline was down to 500 level which is 700 metres below the surface. Stoping was completed to the 600 level, 600 metres below the surface.

Recent exploration has shown that the four lodes presently being mined continue to considerable depths. The Challenger gold mine in the distant, hot, dry, inhospitable outback of South Australia shows what can be achieved with faith, determination and persistence.

Kingsgate Consolidated

Kingsgate Consolidated is an ASX listed gold company with mines and projects nationally and internationally. We are a very successful company with extensive experience in gold exploration, mining and development.Our aim is to increase dividend growth and earning for our shareholders through the...........read more

ADDRESS

Kingsgate Consolidated
Suite 801, Level 8, 14 Martin Place
Sydney, NSW 2000

P.O. Box 453
Torrensville, SA 5031

OTHER INFO

Phone08 8672 1938
fax08 8672 1958

View Kingsgate Consolidated Page

We Currently have No Jobs Specified for

CHALLENGER

Visit Jobs Section

Leighton Contractors has a contract role at challenger

Leighton Contractors are owned by Leighton Holdings, they are an industry leader in their field with over 14,000 employees in four major divisions:Infastructure- Roads, ports, oil & gas, rail, thermal energyMining- Iron Ore, coal, metalsTelecommunications- Fibre network, data centresServices- ...Read More

ADDRESS

Leighton Contractors
495 Victoria Tce
Chatswood, NSW 2067

OTHER INFO

Phone02 8668 6000
fax02 8668 6666

More info about Leighton Contractors

Following are the resources mined at Challenger

Y Fronts teaser banneriComplii MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

iComplii