doing fifo financially smart
HomeMinesQLDCannington
108 ST GEORGES TERRACE PERTH WA , 6000
P: 08 9324 9000 F: 08 9324 9200

CANNINGTON

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The Cannington underground mine located 800 kilometres south west of Townsville is 83 kilometres from the nearest township of McKinlay. It has its own airstrip and village accommodation is located three kilometres from the mine site. A shuttle bus takes workers to and from the airstrip, the mine and the village.

Cannington Mine Area Subjected to Flooding During the wet Season

The area is prone to flooding although the average rainfall is only 250 mm. Most of this rain falls between the months of November and March leaving the area semi-arid for most of the time. Rivers in the area are dry most months of the year.

Cannington Mine is the World's Largest Silver Mine

The Cannington Mine is the world's largest producer of silver and lead that is produced from the one operation. This amount of silver equals six percent of the world's silver and seven percent of the world lead production. The lead concentrate that leaves the Cannington Mine contains 70 percent lead and more than 3,000 grams a tonne of low impurity silver. Zinc concentrate contains 250 grams of silver and 50 percent zinc.

Access to the Cannington Mine is via a Decline

The Cannington underground mine is accessed by means of a decline ramp from the surface although there is a hoisting shaft that can handle 1.8 million tonnes of ore annually. In 2008 the mine processed 3.1 million tonnes of ore which produced, in concentrate form, 163,000 wet metric tonnes of zinc, more than 31 million ounces of silver and 404,000 wet metric tonnes of lead.

Long Hole Stoping Mining Methods Used at the Cannington Mine

Mining underground at the Cannington Mine is undertaken via the long hole open stoping method when extracting ore from the main thicker hanging wall orebodies. Ore broken away from the stopes is loaded from draw points at the bottom of each individual stope and taken to the surface by haulage skips after being hauled along the level and tipped into one of many ore passes.

Cannington Mine Decline Extends Underground for 5,250 Metres

The Cannington decline is 5.5 metres wide by 5.2 metres high with a gradient of one in eight to the 450 metre level, from thereon it has a gradient of one in seven. The decline has a total length of 5,250 metres. Its main function is to provide mobile equipment and personnel access as well as acting as an intake of fresh air.

Hoisting Shaft at the Cannington Mine Begins at the 650 Metre Level

The hoisting shaft has a diameter of 5.6 metres and is constructed to a depth of 650 metres. It has a tower mounted friction winder and two nine tonne skips that are counter balanced on rope guides. The skips are hoisted from the loading station on the 610 metre level and can hoist ore to the surface at a speed of 12 metres a second. Once on the surface the skip is tipped by means of a tipping scroll built into the head-frame that empties the ore into a waiting surface bin that transfers the ore to the processing facilities stockpile area.

Because of regular flooding during the wet season all surface infrastructure, shafts and the decline are raised above ground level to above predicted flood levels. Once a stope has all the ore extracted from it, a paste backfill is put in place to fill the void to stabilise the area and make it safe for the creation of adjoining stopes. Paste backfill is made up of 80 percent solids that are mixed with tailings from the processing plant along with about five percent cement. This is fed underground by gravity feed through boreholes that pipe the backfill directly into the open stope. The Cannington Mine, that is wholly owned by South32, consists of the underground mine and a metallurgical processing plant. It also consists of a rail loading infrastructure at Yurbi, 15 kilometres from Cloncurry and a state of the art mineral concentrate handling facility at the Townsville port.

South 32

Resource company South32 was created on 25th May 2015 as a result of a demerger from BHP Billiton. It is a worldwide diversified mining and metals company with an extensive portfolio that includes cash generative assets such as zinc, lead, silver, nickel, manganese, metallurgical and energy coal,...........read more

ADDRESS

South 32
108 St Georges Terrace
Perth, WA 6000

OTHER INFO

Phone08 9324 9000
fax089324 9200

View South 32 Page

We Currently have No Jobs Specified for

CANNINGTON

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Cannington

Y Fronts teaser banner MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

iComplii