The Brockman No. 4 open cut mine in Western Australia's iron ore rich Pilbara Region is owned and operated by Rio Tinto's fully owned subsidiary Rio Tinto Iron Ore. It is one of 13 other Rio Tinto iron ore mines currently operating in the same region.


Brockman No 4 has an Expected Life of 20 Years
The Brockman No. 4 Mine is in the Hamersley Range where 80 percent of
all identified iron ore reserves in Australia are located. The Brockman No. 4 open cut mine, a massive operation that cost Rio Tinto one and a half billion dollars to build, is sitting on an ore body three kilometres wide by 15 kilometres long and has an expected life of 20 years based on current reserves.


Large Fleet of Heavy Machinery Used at the Brockman No 4 Open cut Mine
Mining at the Brockman No. 4 open cut is carried out using a fleet of 16 Komatsu 830E and two Komatsu 730E haulage trucks that transport the ore from the mine site to the on-site processing plant that uses a primary jaw crusher, two secondary cone crushers, a six bin screening process and a gravity separation system to produce lump and fines iron ore. There is also a stockyard on site that is able to hold over a million tonnes. This stockpiled iron ore is loaded onto rail trucks and taken to the coast on the Hamersley and Robe River Railway for loading onto ships that take it to the company's customers throughout the world. Workers at the mine are flown in and out of the nearby Boolgeeda Airport to work their rosters. While at work they are housed in company village accommodation.


Explosives at the Brockman No 4 Mine Consist of Fuel oil or Ammonium Nitrate
The iron ore deposit at Brockman No.4 is recovered using conventional open cut mining procedures of drilling a hole for blasting after which the loosened ore is loaded onto the trucks and hauled to the processing plant. The drilling is done in specially selected areas with the use of three Reedrill Drill SKSS-16 and two Cubex QXR 1120 blasthole drill rigs. The explosives used at the site consist of either fuel oil or ammonium nitrate that is placed into the drill holes and exploded. This results in the creation of a reasonably sized pit that is suitable for digging out a hauling away.


Preliminary Work Started at the Brockman No 4 Mine in 2008
Prior to actual production getting underway in 2010, work started on the Brockman No 4 Mine in early 2008 to carry out the necessary preliminary work in getting the project ready for mining. Excavators and shovels moved in during 2009, this heavy equipment comprised an EX3600-6 Hitachi Excavator, two Le Tourneau L 1850 wheel loaders and three X5500-6 Hitachi Shovels.


Processing ore at Brockman No 4 Includes Refining
The processing plant at Brockman No. 4 separates the ore into small particles of either high grade magnetite or haematite materials. This is obtained through the gravity separation system. The resulting iron ore pallets are then smelted on site by using a process known as Hlsmelt in preference to using a blast furnace. HIsmelt is an abreviation for high intensity smelting. It is the the worlds first commercial smelting process that produces iron ore directly from the ore itself. The result being a pure pig iron or iron product. This is then stored in a 10 million tonne storage facility at the site.


Pig iron produced by the HIsmelt process is taken from the storage facility and loaded onto railway trucks and taken to the Dampier Port for exporting to steel makers in Europe and Eastern Asia.
 

Rio Tinto

Rio Tinto is a major producer of iron ore, coal, bauxite, alumina, aluminium, uranium, copper, gold, diamonds, salt and energy across the globe. Businesses include open pit and underground mines, refineries, smelters, mills and power stations. Also a number of research facilities and...........read more

ADDRESS

Rio Tinto
152-158 St George s Terrace
Perth, WA 6000

OTHER INFO

Phone0893272000
fax0893665468

View Rio Tinto Page

We Currently have No Jobs Specified for

BROCKMAN NO 4

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Brockman No 4

Y Fronts teaser bannerDowner Group MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

iComplii