Downer
HomeMinesQLDBoyne Island Aluminium Smelter
123 ALBERT ST BRISBANE QLD , 4000
P: 07 3625 3000 F: 07 3625 3001
www.riotintoalcan.com

BOYNE ISLAND ALUMINIUM SMELTER

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The Boyne Island Aluminium Smelter is located on Boyne Island about 20 kilometres south of the Gladstone port in Queensland. It has the capacity to produce 545,000 tonnes of aluminium a year. It is operated by Boyne Smelters Limited a company that is 59.4 percent owned by Rio Tinto Alcan through Pacific Aluminium. Other shareholders are Sumitomo, Marubeni and Mutsubishi.


The Boyne Island Smelter is the Largest Aluminium Smelter in Australia
The Boyne Island aluminium smelter, the largest aluminium smelter in Australia, produces high quality aluminium billets and ingots. Most of its produce is exported to North America and South East Asia where it is used in the recreation and leisure industry, wind power generation, transmission of electricity, construction of buildings, mass transportation and the aerospace industries.


Boyne Island Smelter Opened in 1982
The Boyne Island aluminium smelter was opened in 1982 and originally produced around 210,000 tonnes of aluminium annually. In 1995 it was decided to increase the smelters production capacity to over 540,000 tonnes a year and this was achieved in 1997 when Reduction Line 3 came on-line.


Upgrades Have Extended the Life of the Boyne Island Smelter
Other upgrades were completed in 2012 that involved the complete re- construction of one if the three existing carbon bake furnaces and the replacement of the other two with a completely new furnace. The new furnaces proved to be far more energy efficient and they considerably reduced site greenhouse gas emissions. Other up-grades at the time included the replacement of all reduction Line one and two cranes as well as rale replacements and crane runway upgrades. At the same time an Automated Alumina Distribution System was installed. The upgrades had become necessary to extend the smelter's life, to increase efficiency and to improve overall environmental preformances.


Boyne Island Smelter Construction Began in 1979
Construction of the Boyne Island aluminium smelter began in 1979 and it was officially opened in 1982.The idea of building an aluminium smelter in Queensland took root in 1957 when the mining of bauxite was approved at Weipa on Cape York Peninsula. The authority for Comalco to mine the Weipa bauxite deposit was given under the condition it refined the bauxite to alumina and to consider the building of an aluminium smelter in Queensland. In 1967 Comalco commenced alumina production at its Queensland Alumina Limited Gladstone refinery.


The discovery of multiple coal fields in the Queensland Bowen Basin Region aroused interest in the viability of building an aluminium smelter in the state and in 1972 Comalco was granted permission by the Queensland government to opt for blocks of power from a power station that was planned to be built at Gladstone. The construction of the power station was partly funded by the Australian Government on the condition that portion of the power to be produced be used to bolster the export industry.


In August 1977 Comalco began clearing land and undertaking preliminary earthworks for the building of an aluminium smelter on 50 hectares of land on Boyne Island. However, it was not until August 1979 when Comalco finally put together a consortium to go ahead with the construction of the project. The first aluminium was produced at the plant in February 1982.


Potline 2 start up occurred in July 1983 and the smelter was officially opened soon after. The Boyne Island aluminium smelter now employs around 1,100 employees and contractors.
 

Rio Tinto Alcan Australia

Rio Tinto Aluminium started business with Comalco in the mid 1950's. We brought Comalco in 2000 and the company was re-named Rio Tinto Aluminium in 2006. Alcan INC started in 1902 as a Northern Aluminum company, in the Canadian subsidiary of Pittsburgh Reduction company. They re-named the company...........read more

ADDRESS

Rio Tinto Alcan Australia
123 Albert St
Brisbane, QLD 4000

GPO Box 153
Brisbane, QLD 4001

OTHER INFO

Phone0736253000
fax0736253001

View Rio Tinto Alcan Australia Page

We Currently have No Jobs Specified for

BOYNE ISLAND ALUMINIUM SMELTER

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Boyne Island Aluminium Smelter

Y Fronts teaser banneriComplii MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

Downer Group