Downer
HomeMinesQLDBerwyndale South
LEVEL 30, 275 GEORGE ST BRISBANE QLD , 4000
P: 07 3024 9000 F: 07 3024 8999
qgc@qgc.com.au
www.qgc.com.au

BERWYNDALE SOUTH

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The Berwyndale South coal seam gas field is owned by the London based BG Group through its subsidiary company QGC, formerly Queensland Gas Company. BG Group has operations in 25 countries on five continents throughout the world. The company has a long history in all energy areas, particularly natural gas, where it carries out exploration, development and product delivery operations.


The first Commercial Supply of Gas From the Berwyndale South Field Occurred in 2006
The Berwyndale South coal seam gas field is located 14 kilometres north of the Roma-Brisbane gas pipeline and 32 kilometres south-west of the town of Chinchilla in the Surat Basin Region of Queensland. Coal seam gas field development commenced at Berwyndale South in August 2005 with the first commercial supply of gas from the field being delivered to the CS Energy Swanbank 'E' power station in May 2006.


CS Energy the First to Receive Gas From the Berwyndale South Coal Seam Gas Field
QGC had entered into an agreement to supply gas to CS Energy, a Queensland Government owned energy generating authority, at a rate of 4 petajoules a year for a period of 10 years. By mid 2006 gas from the Berwyndale South gas field was also being delivered to the Braemar power station 40 kilometres west of the town of Dalby.


Berwyndale South Gas is Free Flowing
The Berwyndale South coal seam gas field exists on the central Walloon fairway of the Surat Basin. The field has been producing around 50 terajoules of gas a day with average well production being around 1.9 terajoules, although some wells have been producing up to four terajoules a day. Berwyndale South daily production had been up to 70 terajoules a day until it was reduced to 50 terajoules to enable other nearby coal seam gas fields to be brought into production. A majority of the wells at Berwyndale South don't require pumping as they are free flowing with formation water entrained with the high gas flows.


Berwyndale South Central Gas Treatment Plant Connects to Braemar Gas Accumulator
The Berwyndale South central gas processing plant also processes gas drawn from the Argyle-Kenya coal seam gas field and the trial operations at QGC owned and operated Lauren, Codie and Bellevue fields. During 2008 the Berwyndale South central gas processing facility processed 160 terajoules of gas a day from its previous 100 terajoules as a result of the installation of a 250mm pipeline that took the gas a distance of 14.5 kilometres to connect the Berwyndale South treatment plant to the Braemar power station gas accumulator.


Coal seam gas, such as that produced at the Berwyndale South natural gas field, is also known as coal bed methane, or coal seam methane. It is derived from gas that has been trapped for millions of years in coal fractures underground. The gas is created alongside coal from ancient plants and organic matter generally that has become compressed and heated. The gas is held in place by water pressure.
The QGC, Surat Basin tenements hold gasses that comprise 98 percent methane along with small amounts of ethane, carbon dioxide and nitrogen. This type of coal seam gas requires very little treatment before it becomes commercially viable.


It has been estimated that New South Wales and Queensland have up to
250 trillion cubic feet in gas reserves. Sufficient amounts to supply power to a city of one million people for at least 5,000 years.
 

QGC

QGC is wholly owned by BG Group, a global energy company. QGC is a natural gas explorer and producer focused on having the worlds first conversion of gas from coal seams into liquefied natural gas.One of the largest capital infrastructure projects underway is the Queensland Curtis LNG project...........read more

ADDRESS

QGC
Level 30, 275 George St
Brisbane, QLD 4000

GPO Box 3107
Brisbane, QLD 4001

OTHER INFO

Phone0730249000
fax0730248999

View QGC Page

We Currently have No Jobs Specified for

BERWYNDALE SOUTH

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Berwyndale South

Y Fronts teaser banneriComplii MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....