doing fifo financially smart
HomeMinesQLDArrow Lng Plant
LEVEL 39, 111 EAGLE ST BRISBANE QLD , 4000
P: 07 3012 4000 F: 07 3012 4001
www.arrowenergy.com.au

ARROW LNG PLANT

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The Arrow LNG Plant Project on Curtis Island at Gladstone in Queensland received Federal Government approval on December 10, 2013. This followed Queensland State Government approval having been granted in September, 2013. The liquified natural gas plant on Curtis Island is one of five other linked development projects that are part of the greater Arrow CSG-LNG project. The other projects include the following:

  • Surat Gas Project
  • Arrow Bowen Pipeline
  • Arrow Surat Pipeline
  • Bowen Gas Project

All these linked projects are in varying stages of having approvals granted by both Federal and State governments and all play an important role in meeting future world demand for cleaner burning fuels.


Arrow LNG Plant Previously Known as the Shell Australia LNG Project
The Arrow LNG Plant Project on Curtis Island in Central Queensland was originally known as the Shell Australia LNG Project. It will be supplied with coal seam gas that is to be extracted from Arrow Energy's gas reserves located in the Bowen Basin in Central Queensland and the Surat Basin in South East Queensland. Arrow Energy Pty Ltd is equally owned by Royal Dutch Shell and PetroChina.


Arrow LNG Plant Requires Much Development Before it Can Process LNG at Curtis Island
The Arrow LNG Plant, that has been referred to as a 'significant project' by the Queensland State Government, requires the following work to be undertaken before it will be able to process coal seam gas:


Dredging of the sea bed to allow access to its marine facilities by large gas carriers
Construction of marine facilities, including jetties, on the mainland at Gladstone
The construction of an LNG Carrier Terminal, offloading facilities and jetties on Curtis Island in the area of Hamilton Point, North China Bay and behind Boatshed Point
Construction of a gas pipeline from Curtis Island to near the Bruce Highway
The building of the liquefaction plant where the coal seam gas (CSG) will be converted into LNG (liquefied natural gas).
The construction of storage facilities to hold the LNG while awaiting it to be shipped, via carriers, to the fast growning LNG world market.


The dredging off Port Curtis is to be managed by Gladstone Ports Corporation
. It will extend shipping lanes to the berth pockets as well as develop swings basins for the large LNG carriers to manoeuvre and load. The Arrow LNG Plant itself will produce up to 18 million tonnes of LNG a year through the phased in construction of four trains (individual processing plants) on the Curtis Island site. Stage one of the development will involve the construction of two trains with a capacity to produce four million tonnes of LNG each. These two trains will be constructed behind Boatshed Point.


Shell entered into an agreement with Gladstone Ports Corporation in December, 2009, to acquire land to the south west of Curtis Island. The land is part of the Gladstone State Development Area's 1,500 hectares within the Curtis Island Precinct, that has been specifically put aside for LNG development.


In 2004 Arrow Energy granted the front end engineering design contract for the Arrow LNG Plant to CJV, an international consortium comprising Saipem, Chicago Bridge and Iron (CB&I) and Chiyoda Corporation. Arrow has also started the design process required for the building of a six kilometre tunnel linking the LNG plant on Curtis Island with the mainland at Gladstone, for the purposes of transporting gas and other utilities between the two locations.
 

Arrow Energy

Arrow Energy develop gas fields, produce and sell Coal Seam Gas (CSG) and generate electricity.Developing since 2000 and supplying since 2004, Arrow delivers around 20% of Queensland's gas supply from five CSG fields located in the Bowen and Surat Basins.Arrow sells gas to a few companies including...........read more

ADDRESS

Arrow Energy
Level 39, 111 Eagle St
Brisbane, QLD 4000

GPO Box 5262
Brisbane, QLD 4001

OTHER INFO

Phone0730124000
fax0730124001

View Arrow Energy Page

We Currently have No Jobs Specified for

ARROW LNG PLANT

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Arrow Lng Plant

Y Fronts teaser bannerDowner Group MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

iComplii