ANGUS PLACE

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About: The Angus Place underground black coal mine is located at Lidsdale, 15 kilometres from the thriving NSW Western Coalfields town of Lithgow. The mine produces thermal coal for the domestic and export market at the rate of over seven million tonnes a year. It has proven reserves of more than 85 million tonnes giving it many years of constant production.

Over Five Million Tonnes Annually Goes to Providing Power Domestically
A private road has been constructed, dedicated to coal carrying vehicles only, to take over five million tonnes annually from the Angus Place mine coal crushing plant to the power stations at Mt Piper and Wallerawang. Coal earmarked for export is taken by train from the Lidsdale siding to port Kembla.

Longwall Mining Produces Consistent Results
Coal mining first occurred at the site in 1979 and for the June quarter alone, in 2010, it had recorded a production level of just under one million tonne. At that time mining was taking place at the Wolgan zone where longwall mining was achieving consistently good results. The September quarter in 2010 showed continuing improvement with the production level reaching over one million tonne, an almost 10 percent increase.

Opposition to Extension and Upgrading Plans
Recent plans to extend underground mining at the site to extend the life of the mine beyond 2024 received strong opposition from environmentalists as, at the time, development approvals only extended to 2016. The mine owner plans to continue longwall mining at the site stretching out to the east of current operations. This required an extension of the existing boundary.

To compliment extending the life of the mine the company also plans upgrading the existing infrastructure. Although this isn't necessarily intended to increase the mines total production capabilities it will link the Western Coal Services operation into the Angus Place distribution and processing network. The extension and improved infrastructure will secure local employment and lengthen its operating life.

Environmentalist group Colong Foundation opposed the upgrading and extension plans arguing the company was simply trying to increase production at the mine. The Colong group were claiming any increase of the mine boundary would negatively impact on swamps on the Newnes Plateau. The mine management argued that any damage to the swamps in question was not the result of mining but was due to changing climatic conditions.

Development Going Ahead
Infrastructure development is being developed to allow better coal storage, processing and handling processes between all the company's operations in the area, including that of Angus Place. When completed the facilities will provide Angus Place mine with a new haul roadway and completely separate the logistic function and transport operations from the operating mine itself. It will also increase coal handling capacity to 9.5 million tonnes a year. When completed Angus Place and Springvale will have better access to the power stations and the Lidsdale siding for exporting purposes.

A Bright Future Remains for the Angus Place Coal Mine
Coal mining in NSW has a sound future as the demand for the product both domestically and overseas remains quite strong. The Angus Place mine is a good example of the type of reserves available and while production costs can remain competitive the future remains bright.

Centennial Coal

From Humble beginnings in 1989, by 1994 Centennial Coal was listed on the Australian Stock Exchange and was in the top S+P/ASX 100 company. Making their mark on the thermal and coking coal domestic and export markets.In September 2010, Banpu Public Company took over and today Centennial is a wholly...........read more

ADDRESS

Centennial Coal
1 Market Street, Level 18, BT Tower
Sydney, NSW 2000

OTHER INFO

Phone02 9266 2700
fax02 9261 5533

View Centennial Coal Page

We Currently have No Jobs Specified for

ANGUS PLACE

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Angus Place

Y Fronts teaser bannerDowner Group MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....