National Pump and energy
HomeMinesWAAndy Well
41-43 ORD STREET WEST PERTH WA , 6005
P: 08 9226 0600 F: 08 9226 0633
info@dorayminerals.com.au
www.dorayminerals.com.au

ANDY WELL

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The Andy Well gold mine is located in the northern Murchison Region of Western Australia about 45 kilometres north of Meekatharra. It is wholly owned by Doray Minerals Limited, an Australian Securities Exchange (ASX) listed company, that discovered the high grade Wilber Lode gold mineralisation at the Andy Well site in 2009.

The Wilber Lode was the First Gold Deposit Discovered at the Andy Well Mine

The Wilber Lode gold deposit was to prove to be the beginning of one of the highest margin and highest grade gold mining operations in Australia in 2014 after the Andy Well gold mine began production in August, 2013, just three and a half years after the initial discovery was made.

Andy Well Mine Becomes a High Grade Gold Producer

Doray Minerals Limited were quick to construct all the necessary infrastructure at the mine site, including the gravity, carbon-in-leach and carbon-in-pulp gold processing plant. The Andy Well mine was quick to become one of the highest margin, lowest cost and highest grade gold producers listed on the ASX.

Andy Well Mine has Potential to Have Life Extended

As the Andy Well gold mine Wilber Lode remains open at 450 metres from the surface, the Judy Lode, which is currently a gold Reserve, is open along strike at depth and other high grade zones being discovered at Kirsty and Suzie Lodes, there is already considerable potential for the initial life of the Andy Well mine to be substantially increased.

Andy Well Mine Gold Production Forecasts for 2015 Increased

The Andy Well gold production forecast for the 2015 financial year is now expected to be between 85,000 and 90,000 ounces, although there is also a number of one off expenses anticipated because of the realignment of the Great Northern Highway and the pre-stripping costs related to the stage two open pit. However, because of improved results so far, full year costs are expected to fall approximately $100 an ounce to between $600 and $700 an ounce.

Great Northern Highway Moved to Allow Andy Well Mine to Expand

The Great Northern Highway realignment began in November 2014 which will allow work on the Andy Well stage two open pit to commence in January, 2015, with its completion in July, 2015. There is also potential to mine additional high grade deposits by means of open pit technology as part of the stage two open pit development. Ore mined from the stage two open pit development is expected to start being processed in the March Quarter, 2015. Meanwhile underground mining will continue as planned throughout 2015.

First Gold bar Poured at Andy Well Mine in August 2013

Doray Minerals Limited have run a competitive tender process while developing the Andy Well gold mine that has resulted in a number of companies being appointed to supply a wide range of services. The constructing and commissioning of the gold processing plant, with the assistance of EPC contractor, GR Engineering, was completed ahead of schedule in July, 2013. The plant consists of a 200,000 tonnes a year gravity and carbon-in-pulp capability. The first Andy Well produced gold bar was poured in August, 2013. The successful completion of the company transitioning from being a developer into a high grade gold producer.

Doray Minerals Limited

Doray Minerals Limited is an Australian gold exploration, development and mining company with specific exploration interests in the Murchinson area of Western Australia and number of gold prospects in the Central Gawler Region. The company has two projects to its name; the already operational...........read more

ADDRESS

Doray Minerals Limited
41-43 Ord Street
West Perth, WA 6005

PO Box 284
West Perth, WA 6872

OTHER INFO

Phone0892260600
fax0892260633

View Doray Minerals Limited Page

We Currently have No Jobs Specified for

ANDY WELL

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Andy Well

Y Fronts teaser banner MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

iComplii