About:

The Airly underground coal mine near Capetee, north west of Lithgow, in the Hunter Valley Region of New South Wales, has been placed on care and maintenance by its Thai owners Centennial Coal. The mine site, on the Castlereagh Highway, was acquired by Centennial Coal in 1997 but the company never began development of the mine until 2008. The first load of coal left the Airly Mine in December 2009. At the time the mine was given a life of mine of 20 years if it produced a targeted 1.8 million tonnes a year. The coal produced at the Airly Mine goes towards supplying both the export and domestic markets. It was placed on care and maintenance in January 2013.

Airly Coal Mine Placed on Care and Maintenance

However, Centennial Coal do not intend to abandon the Airly Mine, as while it is on care and maintenance it is continuing to meet all environmental and safety regulations with a team kept onsite to further progress an Airly Extension Project.

Airly Mine to Re-Open When Market Conditions Improve

Centennial Coal have stated they intend re-opening the Airly Mine once market conditions improve and while waiting for this to occur are seeking approvals to renew its existing planning consent by 2014. The existing renewal allows for Centennial Coal to extend its mining further to the east of the current lease. Underground mining is part of this ongoing plan and it claims the extension will increase its coal mining capacity to meet its planned infrastructure upgrading. In the meantime, the New South Wales Government Department of Planning and Infrastructure, is waiting on an Environmental Impact Statement that is to be completed and submitted by Centennial Coal by mid-2013.

Airly Mine Still has Approximately 20 Years of Productive Life Left

The Airly underground mine, when operating, was operated via a continuous miner and place change method and the thermal coal produced was mainly exported. In 2011 the mine was producing half a million tonnes a year although it had a capacity to produce 1.8 million tonnes. It has 33.7 million tonnes in reserves, which, on current production rates, would give the mine a further 18 plus years of production. The coal is railed from the mine to Port Kembla for shipping overseas. The surface infrastructure consists of a coal preparation plant and a railway loop.

Centennial Coal a Subsidiary of Banpu

Centennial Coal, that was established in 1989, is a subsidiary of Thai coal producer Banpu. It operates seven coal mines in NSW and employs more than 1,800 people. Centennial Coal is therefore one of the largest coal producers in NSW and, with its parent company Banpu, is part of the large independent pan-Asian coal group. Centennial Coal exports coal to steel mills and power stations in Europe, Korea, Japan and Taiwan as well as supplying 40 percent of the NSW coal fired power station needs.

Banpu Public Company Limited, the parent company of Centennial Coal, is a large Thailand power and mining company with mining and coal operations in China, Indonesia and Thailand. It also operates power stations in Thailand and China.

Centennial Coal

From Humble beginnings in 1989, by 1994 Centennial Coal was listed on the Australian Stock Exchange and was in the top S+P/ASX 100 company. Making their mark on the thermal and coking coal domestic and export markets.In September 2010, Banpu Public Company took over and today Centennial is a wholly...........read more

ADDRESS

Centennial Coal
1 Market Street, Level 18, BT Tower
Sydney, NSW 2000

OTHER INFO

Phone02 9266 2700
fax02 9261 5533

View Centennial Coal Page

We Currently have No Jobs Specified for

AIRLY MOUNTAIN

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Airly Mountain

Y Fronts teaser banneriComplii MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....