About:

The Hardey/APIJV iron ore project is located from 30 kilometres to 85 kilometres south west of Pannawonica in the West Pilbara region of Western Australia. The project is based on large JORC pisolite iron ore resources totaling more than 2.5 billion tonnes, with potential for substantial more growth as exploratory drilling continues.


The Hardey/APIJV Project will Consist of a Series of Open cut Mining Operations

The Hardey/APIJV iron ore project involves the developing and operating a series of open cut mines, the construction of a new 245 kilometres heavy haul railway network connecting the mine to the port and the building of a new deep water port at Anketell Point, 25 kilometres to the east of Karratha, capable of exporting over 350 million tonnes of direct shipping iron ore (DSO) annually for at least the next 20 years, accommodating multiple mining customers exporting multiple types of mining products.


Hardey/APIJV Feasibility Study Completed in 2012

The Feasibility Study examining the Hardey/API JV project, that was completed in 2012, is currently being advanced by improving the project's cost structure and configuration for the Joint Venture owners; Aquila Steel Pty Ltd and AMCI (American Metals and Coal International Pty Ltd). Both companies hold a 50 percent interest in the project. The Joint Venture company APIJV, that was inaugurated in early 2005, is managed by API Management Pty Ltd, from its head office in Perth.

The Hardey/APIJV mining and marketing Feasibility Study was conducted by APIM (API Management) and the rail and port infrastructure Feasibility Study was undertaken by Aurizon, with a final investment decision to be made by Hardey/APIJV in the latter half of 2016, subject to long term iron ore market fundamentals being positive.


Hardey/APIJV pit to Mine 90 Metres Below Water Table

The Hardey/APIJV mining operation is proposed to be undertaken as open pit mining using the conventional drill, blast and excavation technique. Mining is to continue to a depth of 90 metres below the water table with de-watering being carried out at a rate of 1.5 gigalitres a year. The dewatering rate will be adjusted to suit the operational water demand of the project to minimise risk and any surplus water discharge occurring. The mining operation will be backfilled as work progresses, to a depth of five metres above the pre-mining water table. The water consumption will used for dust suppression, washing of equipment and construction and potable purposes generally.

Natural vegetation will be disturbed over an area of 650 hectares to allow the mine pits to be established as well as for land clearing to accommodate roads, administrative buildings and an accommodation camp, including that for other utilities, such as the ore processing plant, crusher and screening facility. The Goldfields Gas Transmission Pipeline is located 20 kilometres from the site.

It is expected a construction workforce of around 600 personnel will be required to build the project infrastructure and up to 300 people will be required to run the operation on a permanent basis. The accommodation village is planned to be built 3.5 kilometres from the mining operation

APIJV

APIJV was inaugurated in February 2005 with the objective of developing a long-term iron ore export operation in the Pilbara region of Western Australia. The APIJV is managed by API Management Pty Ltd (APIM) in Perth, Western Australia.

ADDRESS

APIJV
Lvl 1 1 Preston Street Como
, WA 6152

OTHER INFO

fax0994230233

View APIJV Page

We Currently have No Jobs Specified for

HARDEY APIJV

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Hardey APIJV

Y Fronts teaser banner MiningLink prefered resume writers Civil Link Banner
Boilermakers
Boilermakers required for various roles for fixed plant and mobile equipment shutdowns

Riggers Dido


Operator Maintainer
Bis Industries requires an Operator Maintainer to join our operations at Karara, this is offered FIFO on 2:1 roster from Perth, come join the team!

Mc Truck Drivers Gunnedah
Bis Industries is seeking MC Drivers commencing at Gunnedah on a Monday to Friday roster and every other Saturday as required.

Mc Drivers Goldfields
Seeking expressions of interest from experienced MC Drivers, in consideration for multiple opportunities across our operations in the Goldfields.

Prelude Arrives In Australia
Shell Australia's Prelude floating liquefied natural gas (FLNG) facility has arrived in Australian waters this week after its 5,800km journey from the Samsung Heavy Industries shipyard in Geoje, ....

Australia's Largest Testing Rig Unveiled In Rocky
Siemens has invested $5 million into the Rockhampton Service Centre, which unveiled this week, Australia’s largest and most advanced gearbox load test rig for mining, wind power and other core ....

Dinosaur Find At Qld Mine Site
Palaeontologists and volunteers will work over the next month excavating and studying 30,000-year-old dinosaur bones at the South Walker Creek mine in Central Queensland. The team of eight people, ....

Black Thoated Finch Puts New Coal Mine At Risk
The controversial black throated finch is back to cause problems for Adani with a fresh legal challenge over the planned Carmichael coalmine. New advice has found the federal environment ....

Monadelphous Awarded $55M In Contracts
Monadelphous Group Limited announced on Wednesday it has been awarded a number of new work packages with a combined value of approximately $55 million. The engineering company will carry out ....

iComplii